Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 3 Attachment 1 - Incorporated Provisions.docx | DOCX | Jun 5, 2026 | |
Amendment 3 Attachment 2 - RFI Answer Clarification.docx | DOCX | Jun 5, 2026 | |
36C26026R0076 0003.docx | DOCX | Jun 5, 2026 | |
36C26026R0076 0002.docx | DOCX | Jun 4, 2026 | |
Amendment 2 Attachment 1b - C-104-GP_BID RFI SET.pdf | Jun 2, 2026 | ||
36C26026R0076 P0002 SF-30 draft.docx | DOCX | Jun 2, 2026 | |
Amendment 2 Attachment 1 - RFI Questions and Answers.pdf | Jun 2, 2026 | ||
Amendment 2 Attachment 2 - SF-1442 pages 6 through 14.docx | DOCX | Jun 2, 2026 | |
Amendment 2 Attachment 1a - 653-23-100 - VA OR Roseburg UST - Architectural - AE301 update.pdf | Jun 2, 2026 | ||
36C26026R0076 0001.docx | DOCX | May 27, 2026 | |
ATTACHMENT 1 - 653-23-100 Remove Replace UFT Bidwalk Sign In Sheet 051326.pdf | May 27, 2026 | ||
ATTACHMENT 2 - RFO CLAUSE 52.222-90.docx | DOCX | May 27, 2026 | |
36C26026R0076 SF-1442.docx | DOCX | Apr 29, 2026 | |
36C26026R0076.docx | DOCX | Apr 29, 2026 | |
ATTACHMENT 2 - 100 Percent Submittal Specs 653-23-100.pdf | Apr 29, 2026 | ||
ATTACHMENT 3 - 100 Percent Submittal Drawings 653-23-100.pdf | Apr 29, 2026 | ||
ATTACHMENT 4 - DOL Wage Determination OR20260066 Mod 1 - 23 Jan 2026.pdf | Apr 29, 2026 | ||
ATTACHMENT 5 - Past Performance Reference Form.docx | DOCX | Apr 29, 2026 | |
ATTACHMENT 1 - Remove Replace UST SOW 1 653-23-100.docx | DOCX | Apr 29, 2026 |
Y1NA--CON | NRM 653-23-100 | Remove Replace Underground Fuel Tanks
Y1NA--CON | NRM 653-23-100 | Remove Replace Underground Fuel Tanks
Project 653-23-100 involves removing and replacing underground fuel tanks at the VA Roseburg Healthcare System in Oregon. This 100% SDVOSB set-aside, issued under solicitation 36C26026R0076, has an estimated construction value between $1,000,000 and $5,000,000. The work includes decommissioning existing tanks and installing new above-ground fueling systems at Building 2, Building 7, and the main Fuel Farm. Technical requirements cover the removal of 1,000-gallon and 12,000-gallon tanks, followed by the installation of skid-mounted fueling stations and double-walled piping for E85 fuel. The contractor will manage PLC control systems, environmental and geotechnical reporting, and fuel polishing for reused fuel. The 365-day performance period includes a 90-day Limited Notice to Proceed for administrative tasks and submittals. Recent amendments have added 38 RFI responses, increased the construction warranty to four years, and updated evaluation criteria to focus on prime contractor experience with tanks of 10,000 gallons or larger. Proposals are due June 17, 2026, and require three volumes: technical approach, past performance, and price. Technical requirements specify E85 compatibility, skid-mounted stations, and PLC systems. Amendment 0002 established a four-year construction warranty and a 365-day performance period, which begins with a 90-day Limited Notice to Proceed. The VA requires the removal of underground storage tanks (UST) and the installation of above-ground tanks (AST) at the Roseburg VA Medical Center. The project covers Building 2, Building 7, and the Fuel Farm, with tank sizes ranging from 1,000 to 15,000 gallons. New work includes concrete foundations, security fencing, and crash-rated bollards.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Kelly B Updegraff, Contractor
Roseburg, OR 97471
USA
Amendment 0001, Amendment 0002, and Amendment 0003 have been posted.