Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 14, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 14, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 14, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S8526BA001¬iceType=SolicitationNotice | LINK | May 14, 2026 |
VGLZ 182035 REPAIR BASE PERIMETER ROAD
The Department of the Army, through the W7NF USPFO Activity MIANG 127, is soliciting bids for the repair and construction of the base perimeter road at Selfridge Air National Guard Base. This project involves constructing new two- and three-lane roads across approximately 4.2 miles, including Jefferson Avenue from the Main Gate to Wilbur Wright Boulevard. The scope includes full-depth pavement repairs, mill and overlay operations, and crack repairs for the entire perimeter road system. This solicitation is set aside for Small Business Administration (SBA) participants under NAICS code 237310, Highway, Street, and Bridge Construction. Civil engineering requirements include installing subsurface edge drainage for all new pavement and localized grading to fix existing drainage issues. Contractors must also remove and reinstall steel wedge and jersey barriers in coordination with base security and maintain continuous traffic flow during construction. A site visit is scheduled for June 3, 2026, with bids due by June 24, 2026. The opportunity includes updated drawings, technical specifications, and a PIEE vendor registration guide. Bidders must coordinate base access four days before the site visit and acknowledge all updates, including Update Number 0001, in their final submissions. This solicitation from the Michigan Air National Guard (MIANG) 127th Wing covers the repair and reconstruction of the perimeter road at Selfridge Air National Guard Base. Work covers 4.2 miles of two- and three-lane roads, including a one-mile stretch from the Main Gate to Wilbur Wright Boulevard.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
David Brown
48045
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for,...
View more