Name | Type | Posted | Actions |
|---|---|---|---|
H2406 PreBid Site Visit Roster.pdf | Feb 5, 2026 | ||
Precon slides B1255 PDF.pdf | Feb 2, 2026 | ||
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HV26RA001¬iceType=SolicitationNotice | LINK | Jan 15, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jan 15, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jan 15, 2026 | |
https://dodprocurementtoolbox.com/ | LINK | Jan 15, 2026 |
FY26 REPAIR WHOLE HOUSE, BUILDING 1255, MCAS IWAKUNI, JAPAN
FY26 REPAIR WHOLE HOUSE, BUILDING 1255, MCAS IWAKUNI, JAPAN
FY26 REPAIR WHOLE HOUSE, BUILDING 1255, MCAS IWAKUNI, JAPAN
Contact and place of performance
Charles Qi
Not specified
24 April 2026 update: AM0003 added ACM survey report to specifications. FY26 REPAIR WHOLE HOUSE, BUILDING 1255, MCAS IWAKUNI, This project revitalizes six officer (O1-O3 and W1-W3) family housing units located in the North Side Housing Area at Marine Corps Air Station Iwakuni (MCASI), Japan. Sustainment work includes, but not limited to, exterior painting; repairing and painting/tiling all interior walls and ceilings...
View moreThe U.S. Department of the Army, Engineering District Japan, is soliciting for the revitalization of six officer family housing units located in Building 1255 at Marine Corps Air Station Iwakuni, Japan. This project, identified under solicitation number W912HV26RA001, involves both sustainment and modernization work for units in the North Side Housing Area. The requirement is categorized under NAICS 236118 Residential Remodelers and PSC Y1FA CONSTRUCTION OF FAMILY HOUSING FACILITIES. The response deadline for this notice is May 28, 2026.
Sustainment work includes exterior painting, concrete sub-base repairs, and the replacement of roofing, flashing, drains, and gutters. Interior improvements involve repairing and painting walls and ceilings, as well as replacing doors, hardware, shelving, cabinets, and vinyl flooring. Comprehensive utility upgrades are required, including the replacement of sewage, domestic water, and HVAC piping, along with all electrical wiring and fixtures to comply with the National Electrical Code. Modernization efforts include installing additional lighting, electrical outlets, and upgraded infrastructure for television, telephone, and internet access.
Charles Qi serves as the point of contact for this solicitation. Project documentation includes three attachments: a pre-bid site visit roster, pre-construction slides, and an additional PDF specification. An April 2026 update further modified the project specifications to incorporate an asbestos-containing material survey report.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.