Name | Type | Posted | Actions |
|---|---|---|---|
Abstract W911XK26BA010.pdf | Jan 23, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | Jan 23, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jan 23, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jan 23, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911XK26BA010¬iceType=SpecialNotice | LINK | Jan 23, 2026 |
Sebewaing River South Levee Repairs
Contact and place of performance
Sally Artz
48759
****Bid Abstract is being posted***Amendment 0004***Sebewaing River South Levee Repairs - This Invitation for Bid is being solicited as a 100% small business set-aside. The requirements for this project include: Mobilize equipment and machinery to Sebewaing, Michigan. The work will take place along the Sebewaing River and south levee, between Center Street and Railroad bridge. Clear vegetation, install steel sheet piles, install earth anchors, and backfill/grade as shown on the plans. Excavated material will be reused onsite for backfill and grading. Demobilize when complete.
The U.S. Army Corps of Engineers, Detroit District, issued this special notice to provide a bid abstract for the Sebewaing River South Levee Repairs project under solicitation number W911XK26BA010. This requirement is a 100% small business set-aside (SBA) classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z1KA, Maintenance of Dams. One attachment, titled Abstract W911XK26BA010.pdf, was published alongside the notice on January 23, 2026.
The scope of work involves mobilizing equipment and machinery to Sebewaing, Michigan, to perform repairs along the Sebewaing River and south levee between Center Street and the railroad bridge. Specific tasks include clearing vegetation, installing steel sheet piles, and installing earth anchors. The contractor is responsible for backfilling and grading the site using excavated material reused from the project location. The project concludes with the demobilization of all equipment and machinery upon completion of the specified work.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.