Sebewaing River South Levee Repairs
Contact and place of performance
Sally Artz
48759
****Bid Abstract is being posted***Amendment 0004***Sebewaing River South Levee Repairs - This Invitation for Bid is being solicited as a 100% small business set-aside. The requirements for this project include: Mobilize equipment and machinery to Sebewaing, Michigan. The work will take place along the Sebewaing River and south levee, between Center Street and Railroad bridge. Clear vegetation, install steel sheet piles, install earth anchors, and backfill/grade as shown on the plans. Excavated material will be reused onsite for backfill and grading. Demobilize when complete.
The U.S. Army Corps of Engineers, Detroit District, is soliciting bids for the Sebewaing River South Levee Repairs project under solicitation number W911XK26BA010. This requirement is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z1KA, Maintenance of Dams. The project is designated as a 100% Small Business Administration (SBA) set-aside. Administrative updates for this notice include the posting of a bid abstract and Amendment 0004.
The scope of work involves the mobilization of equipment and machinery to Sebewaing, Michigan, to perform repairs along the Sebewaing River and south levee. Performance is localized between Center Street and the Railroad bridge. Specific project requirements include clearing vegetation, installing steel sheet piles and earth anchors, and performing backfilling and grading according to provided plans. Excavated materials are to be reused onsite for the backfill and grading processes. The contractor is responsible for demobilization upon the completion of all work.
Sally Artz serves as the primary point of contact for this solicitation, which was published on January 23, 2026. The associated documentation includes one PDF attachment titled Abstract W911XK26BA010.pdf, which was also posted on January 23, 2026.