Name | Type | Posted | Actions |
|---|---|---|---|
Contractor Staging Area.png | PNG | May 14, 2024 | |
SPONSON Electrical and Coolant Connections.pdf | May 14, 2024 | ||
V7 Contractor Questions.xlsx | XLSX | May 14, 2024 | |
Site Visit Signature Page.pdf | May 14, 2024 | ||
AMD03 ISO209-24.pdf | May 14, 2024 | ||
AMD02 ISO209-24.pdf | Apr 30, 2024 | ||
AMD01 ISO209-24.pdf | Apr 16, 2024 | ||
ISO209-24.pdf | Apr 3, 2024 | ||
Attachment 8 CDRLs Table.pdf | Apr 3, 2024 | ||
Attachment 7_Applicable Documents.pdf | Apr 3, 2024 | ||
Attachment 6_Acronym Table (1).pdf | Apr 3, 2024 | ||
Attachment 6_Acronym Table (2).pdf | Apr 3, 2024 | ||
Attachment 3 EDM-D-00018r-_SPONSON HVAC ASSEMBLY.pdf | Apr 3, 2024 | ||
Attachment 1-MIL-STD-2042-6C(SH) Fiber Optic Testing Standards.pdf | Apr 3, 2024 |
UTILITIES HOOK-UP SPONSON UNITS
Contact and place of performance
Kimberly Schwinn
Crane, IN
USA
In order to receive a copy of the RFP package you must be Joint Certification Program (JCP) active. Please request the RFP package through www.sam.gov Request for the RFP must be made by April 25, 2024, at 1:00 PM EST. The solicitation is 100% set aside for Joint CertificationProgram (JCP) Small Business. The North American IndustrialClassification System (NAICS) Code applicable to this project is236220, commercial a...
View moreThe Federal Prison System Bureau of Prisons issued solicitation ISO209-24 as a combined synopsis and solicitation for the utility hook-up of four new mobile Sponson units and auxiliary equipment in Crane, Indiana. This requirement is a 100% small business set-aside (SBA) and is restricted to entities active in the Joint Certification Program (JCP). The project is classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Y1JZ, Construction of Miscellaneous Buildings. Responses are due by May 23, 2024, and Kimberly Schwinn is the designated point of contact.
The scope of work requires the contractor to provide a turnkey design and complete the construction and utility connections for all four Sponsons. These units will be delivered and set in place prior to the start of the contract, and the contractor is responsible for connecting power, chilled water, compressed air, and data services. The design phase includes mandatory milestones for stamped and certified drawing submissions at the 50%, 95%, and 100% completion stages. Documentation associated with this notice includes 14 attachments, such as site visit records, contractor staging area diagrams, electrical and coolant connection specifications, and multiple solicitation amendments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.