Burnsville Rip Rap
Contact and place of performance
Travis Adkins
26631
Contractor shall provide all labor, equipment, and materials required to deliver Stone within 30 days post award, to U.S. Army Corps of Engineers Burnsville Lake Project. Contractor shall notify the government point of contact 5 business days prior to delivery to allow time for the project to get equipment rented to place the stone. The stone being delivered to Falls Mill will need to be delivered on a schedule to re...
View moreThe Department of the Army, Huntington District, has issued solicitation W9123725QA054 for the delivery of stone products to the Burnsville Lake Project. This procurement is designated as an SBA SBA set-aside under NAICS code 327991 Cut Stone and Stone Product Manufacturing and PSC 5610 MINERAL CONSTRUCTION MATERIALS, BULK. The contractor must provide all labor, equipment, and materials to deliver the stone within 30 days of the contract award. Responses are due by August 21, 2025, and are managed by the point of contact, Travis Adkins.
The scope of work includes delivering 500 tons of 12–24-inch rip rap and 50 tons of 3-inch crusher run to Falls Mill, along with 250 tons of 6–12-inch rip rap and 400 tons of 57 clean gravel to Bulltown Campground. All rip rap must be clean, rectangular field stone or rough unhewn quarry stone that meets West Virginia Department of Transportation Section 704.2 specifications. Materials must maintain a maximum weighted loss of 30 percent across five cycles of sodium sulfate soundness testing, and a letter certifying compliance with these specifications is required before delivery.
Logistical requirements mandate that the contractor notify the government five business days before arrival to facilitate equipment rentals at the project site. Deliveries to Falls Mill are restricted to a maximum of four truckloads per day, with two trucks permitted between 0800 and 1000 Eastern Time and two between 1130 and 1330 Eastern Time. Bulltown Campground deliveries may occur anytime between 0800 and 1430 Eastern Time with no daily quantity limit. These schedules are intended to minimize stone rehandling and ensure efficient placement.