Name | Type | Posted | Actions |
|---|---|---|---|
I.B.08 Attachment 17 - Sample Task Order Attachment B Rev 01 - Dated 9 September 2020.xlsx | XLSX | Sep 11, 2020 | |
I.B.08 Attachment 19 - Questions- Dated 9 September 2020.pdf | Sep 11, 2020 | ||
I.B.08 FRP Pacific Region RFP Conform - 11 September 2020.pdf | Sep 11, 2020 | ||
I.B.08 Attachment 16 - Sample Task Order Rev 01 - Dated 9 September 2020.pdf | Sep 11, 2020 | ||
I.B.08 FRP Pacific Region SYNOPSIS-Amendment 1- W912DY20R0034 - 9 September 2020.pdf | Sep 11, 2020 | ||
I.B.08 FRP Pacific Region RFP MOD - 11 September 2020.pdf | Sep 11, 2020 | ||
I.B.08 Attachment 15 - Descriptive Data for ECPs and REAs.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 12 - Demolition and Recycling Final Report.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 5 - Small Business Participation Commitment.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 6- Letter of Commitment (Key Subcontractor).pdf | Aug 26, 2020 | ||
I.B.08 Attachment 1 - Performance Requirements Summary.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 3 - Experience Reporting Form.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 7 - FRP Small Business Decision Matrix.pdf | Aug 26, 2020 | ||
I.B.08 FRP Pacific Region RFP W912DY20R0034 - 26 AUG 2020 - FINAL.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 8 - Monthly Progress Report Format.pdf | Aug 26, 2020 | ||
I.B.08 FRP Pacific Region SYNOPSIS W912DY20R0034 - 26 AUG 2020 - FINAL.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 9 - Work Plans, Sub-Plans, and Appendices.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 4- Past Performance Questionnaire.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 16 - Sample Task Orderr.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 11 - Safety and Health Program Requirements.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 14 Specification Guide 02221 - Ex-Back-Site.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 13 Specification Guide 02220 - Demolition.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 17 - Sample Task Order Attachment B.xlsx | XLSX | Aug 26, 2020 | |
I.B.08 Attachment 18 - Estimated Quantities.xlsx | XLSX | Aug 26, 2020 | |
I.B.08 Attachment 10 - Accident Prevention Plan Checklist.pdf | Aug 26, 2020 | ||
I.B.08 Attachment 2 - Quality Assurance Surveillance Plan.pdf | Aug 26, 2020 |
FRP Pacific Region MATOC
FRP Pacific Region MATOC
Contact and place of performance
Therisa Means
USA
This acquisition is for services to remove, demolish and/or deconstruct small to very large facilities and the associated abatement of facility contaminates. Demolition services include facility reduction, removal of trees and vegetation, parking lots, drives, sidewalks, roadways, utility and electrical disconnections, removal and rerouting of utility connections, removal of outbuildings, site-assessments, removal of...
View moreThe U.S. Army Engineering and Support Center in Huntsville issued this solicitation to establish a Multiple Award Task Order Contract (MATOC) for facilities reduction program services within the Pacific Region. The scope entails the removal, demolition, and deconstruction of facilities ranging from small to very large, alongside the abatement of associated contaminants. Primary demolition activities include facility reduction, vegetation removal, site restoration, and the disconnection or rerouting of utilities. Additional requirements involve site assessments, the removal of storage tanks, recycling of building materials, and data analysis and reporting.
The acquisition also encompasses comprehensive abatement services such as environmental assessments and the mitigation of lead, asbestos, chemicals, polychlorinated biphenyls, and petroleum byproducts. Contractors are responsible for environmental sampling, the redirection of debris waste streams, and the transportation and disposal of both hazardous and non-hazardous regulated materials. These activities support the broader goal of site restoration and the proper handling of facility contaminants across the performance area within the United States.
Registered under NAICS 6-digit code 238910 for Site Preparation Contractors and PSC P500 for Salvage- Demolition of Structures/Facilities (Other Than Buildings), this solicitation is identified by number W912DY20R0034. Responses are due by September 30, 2020. The solicitation includes 26 attachments, featuring revised sample task orders, question-and-answer documents, and a conformed request for proposals updated as of September 11, 2020. Therisa Means serves as the primary point of contact for this federal requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.