Name | Type | Posted | Actions |
|---|---|---|---|
20. Amendment 47PB5126R0008 0005 2026 06 02.pdf | Jun 2, 2026 | ||
19. Amendment 47PB5126R0008 0004 2026 05 29.pdf | May 29, 2026 | ||
18. PBS Core Building Standards Memorandum February 2025 .pdf | May 29, 2026 | ||
17. Land Port of Entry Design Standard 2023.pdf | May 29, 2026 | ||
10. Addendum 1 Alburg Springs Specifications -Revised 2026 05 18.pdf | May 21, 2026 | ||
15. Amendment 47PB5126R0008 0003 2026 05 21.pdf | May 21, 2026 | ||
16. Alburg Springs - Port Signage SOW-ASR 01.pdf | May 21, 2026 | ||
Alburg Springs LPOE Conference-Site Visit meeting minutes_Rev 1 Amendment 0002_ 2026 05 15.pdf | May 15, 2026 | ||
14. Amendment 47PB5126R0008 0002 2026 05 15.pdf | May 15, 2026 | ||
13. Amendment 47PB5126R0008 0001 2026 05 12.pdf | May 12, 2026 | ||
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf | May 5, 2026 | ||
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf | May 4, 2026 | ||
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdf | May 1, 2026 | ||
FB - Filter Box Cutsheet.pdf | Apr 16, 2026 | ||
DH - Duct Mounted Humidifier Cutsheet.pdf | Apr 16, 2026 | ||
GI and GR - Gravity Intake and Relief Cutsheet.pdf | Apr 16, 2026 | ||
FT - Fin Tube Cutsheet.pdf | Apr 16, 2026 | ||
SG - Supply Grille Cutsheet.pdf | Apr 16, 2026 | ||
RG - Return Grille Cutsheet.pdf | Apr 16, 2026 | ||
ET - Expansion Tank Cutsheet.pdf | Apr 16, 2026 | ||
VT0551BS-AlburgSprings-Narrative-02-06-2026 (1).pdf | Apr 16, 2026 | ||
BT - Buffer Tank Cutsheet.pdf | Apr 16, 2026 | ||
SG and EG - Security Grille Cutsheet.pdf | Apr 16, 2026 | ||
AS - Air Separator Cutsheet.pdf | Apr 16, 2026 | ||
PUH - Propeller Unit Heater Cutsheet.pdf | Apr 16, 2026 | ||
BSF - Booth Supply Fan Cut Sheet.pdf | Apr 16, 2026 | ||
GFT - Glycol Feed Tank Cutsheet.pdf | Apr 16, 2026 | ||
2026-02-06 Review of Proposed Renovations - Historic Context (1).pdf | Apr 16, 2026 | ||
Alburg Springs VT LPOE Code Report - 20260206 (1).pdf | Apr 16, 2026 | ||
2026.01.16_100% CD Stormwater Report (1).pdf | Apr 16, 2026 | ||
RP - Horizontal Radiant Panel Cutsheet.pdf | Apr 16, 2026 | ||
RP - Vertical Radiant Panel Cutsheet.pdf | Apr 16, 2026 | ||
10. Alburg Springs LPOE Specifications 2026-02-06.pdf | Apr 15, 2026 | ||
EF - Exhaust Fan Cutsheet.pdf | Apr 15, 2026 | ||
HUM - Steam Humidifier Cutsheet.pdf | Apr 15, 2026 | ||
EHC - Electric Heating Coil Cutsheet.pdf | Apr 15, 2026 | ||
FCU - Fan Coil Unit Cutsheet.pdf | Apr 15, 2026 | ||
KH - Kitchen Hood Cutsheet.pdf | Apr 15, 2026 | ||
CP and GP - Pump Cutsheets.pdf | Apr 15, 2026 | ||
ERV - Energy Recovery Ventilator Cutsheet.pdf | Apr 15, 2026 | ||
EH - Electric Wall Heater Cutsheet.pdf | Apr 15, 2026 | ||
HP and CU - Heat Pump Mini-Split Cutsheet.pdf | Apr 15, 2026 | ||
GSHP - Ground Source Heat Pump Cutsheet.pdf | Apr 15, 2026 | ||
EFM - Electric Floor Mat Cutsheet.pdf | Apr 15, 2026 | ||
2026-01-09 Acoustics Narrative for CD Submission (1).pdf | Apr 15, 2026 | ||
10199.001.2026.02.04 100% Construction Documents Package (Dated 02.06.26) - combined.pdf | Apr 15, 2026 | ||
RP - Vertical Radiant Panel Cutsheet.pdf | Apr 15, 2026 | ||
FB - Filter Box Cutsheet.pdf | Apr 15, 2026 | ||
RP - Horizontal Radiant Panel Cutsheet.pdf | Apr 15, 2026 | ||
FT - Fin Tube Cutsheet.pdf | Apr 15, 2026 | ||
DH - Duct Mounted Humidifier Cutsheet.pdf | Apr 15, 2026 | ||
GI and GR - Gravity Intake and Relief Cutsheet.pdf | Apr 15, 2026 | ||
RG - Return Grille Cutsheet.pdf | Apr 15, 2026 | ||
SG - Supply Grille Cutsheet.pdf | Apr 15, 2026 | ||
GFT - Glycol Feed Tank Cutsheet.pdf | Apr 15, 2026 | ||
ET - Expansion Tank Cutsheet.pdf | Apr 15, 2026 | ||
BT - Buffer Tank Cutsheet.pdf | Apr 15, 2026 | ||
SG and EG - Security Grille Cutsheet.pdf | Apr 15, 2026 | ||
PUH - Propeller Unit Heater Cutsheet.pdf | Apr 15, 2026 | ||
BSF - Booth Supply Fan Cut Sheet.pdf | Apr 15, 2026 | ||
AS - Air Separator Cutsheet.pdf | Apr 15, 2026 | ||
2026-02-06 Review of Proposed Renovations - Historic Context (1).pdf | Apr 15, 2026 | ||
Alburg Springs VT LPOE Code Report - 20260206 (1).pdf | Apr 15, 2026 | ||
2026.01.16_100% CD Stormwater Report (1).pdf | Apr 15, 2026 | ||
3. Agreement 2026 04 15.pdf | Apr 15, 2026 | ||
6. WD VT20250027 2026 04 15.pdf | Apr 15, 2026 | ||
5. Proprietary Information Agreement 2026 04 15.docx | DOCX | Apr 15, 2026 | |
9. Model Subcontracting Plan 2026 04 15.docx | DOCX | Apr 15, 2026 | |
2. SF1442 47PB5126R0008_2026 04 15.pdf | Apr 15, 2026 | ||
8. Tips on Preparing a Subcontracting Plan 2026 04 15.pdf | Apr 15, 2026 | ||
1. Solicitation 2026 04 15.pdf | Apr 15, 2026 | ||
4. GSA527-21a 2026 04 15.pdf | Apr 15, 2026 | ||
7. PBS PPQ 2026 04 15.pdf | Apr 15, 2026 | ||
12. 65% CD Driveway Extension.pdf | Apr 15, 2026 | ||
11. VT0551BS-AS-100CD-2026-02-06.pdf | Apr 15, 2026 | ||
Required System Volume Calculation.pdf | Apr 15, 2026 | ||
Geothermal System Volume Calculation.pdf | Apr 15, 2026 | ||
CHW System Summary (system volume).pdf | Apr 15, 2026 | ||
HW System Summary (system volume).pdf | Apr 15, 2026 | ||
GSAALB_1.PDF | Apr 15, 2026 | ||
GP - Geothermal Pump Report.pdf | Apr 15, 2026 | ||
CP - Cooling Pump Report.pdf | Apr 15, 2026 | ||
CP - Heating Pump Report.pdf | Apr 15, 2026 | ||
04 - BIM Submission QC Checklist - v2024.1 (07.15.2024).xlsx | XLSX | Apr 15, 2026 | |
Refrigerant Volume Calcs.xlsx | XLSX | Apr 15, 2026 | |
10199 - Room Summary.xlsx | XLSX | Apr 15, 2026 | |
GSA-AL_1.XLS | XLS | Apr 15, 2026 | |
GSA-AL_2.XLS | XLS | Apr 15, 2026 | |
RFS Air Pressure Drop - ERV-1 RAEA.xls | XLS | Apr 15, 2026 | |
RFS Air Pressure Drop - EF-1.xls | XLS | Apr 15, 2026 | |
GSAALB_1.XLS | XLS | Apr 15, 2026 | |
RFS Air Pressure Drop - ERV-1 OASA.xls | XLS | Apr 15, 2026 | |
VT0551BS-Alburg Springs LPOE-ARCH-COBie.xlsx | XLSX | Apr 15, 2026 | |
VT0551BS Alburg Springs Certification Statement-Arch (1).pdf | Apr 15, 2026 | ||
Alburg Springs Certification Statement-JH FA (2).pdf | Apr 15, 2026 | ||
Alburg Springs Certification Statement-JH FA (1).pdf | Apr 15, 2026 | ||
LWS CERTIFICATION (1).pdf | Apr 15, 2026 | ||
10199.001.2026.02.06 Alburg Springs Certification Statement-FA (1).pdf | Apr 15, 2026 | ||
10199.001.2026.02.06 Alburg Springs Certification Statement-Plumb (1).pdf | Apr 15, 2026 | ||
10199.001.2026.02.06 Alburg Springs Certification Statement-Elec (1).pdf | Apr 15, 2026 | ||
10199.001.2026.02.06 Alburg Springs Certification Statement-Mech (1).pdf | Apr 15, 2026 | ||
10199.001.2026.02.06 Alburg Springs Certification Statement-Struct (1).pdf | Apr 15, 2026 | ||
Alburg Springs Certification Statement-Christopher_Gendron (2).pdf | Apr 15, 2026 | ||
Alburg Springs Certification Statement-Christopher_Gendron (1).pdf | Apr 15, 2026 | ||
L - Louver Cutsheet.pdf | Apr 15, 2026 |
Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of Entry (LPOE), Alburg, Vermont
Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of Entry (LPOE), Alburg, Vermont
Contact and place of performance
Emily Jackson
Alburgh, VT 05440
USA
Amendment 005 has been uploaded as an attachment on 6/2/2026 Amendment 004 has been uploaded as an attachment on 5/29/2026 Amendment 003 has been uploaded as an attachment on 5/21/2026 Amendment 002 has been uploaded as an attachment on 5/15/2026 Amendment 001 has been uploaded as an attachment on 5/12/2026 The General Services Administration (GSA), Public Buildings Service (PBS) Office of Acquisition Management inte...
View moreTo access the controlled documents, you must submit the signed Attachment 5- Proprietary Information Agreement and the official request by clicking on each controlled document to proceed.
Pre-Proposal Conference/Site Visit
Date: May 6th, 2026
Time: 12:00PM EST
Location: 303 Alburgh Springs Road, Alburgh, VT
Please be advised of the upcoming pre-proposal conference and site visit. To attend, you must register by May 1, 2026, by 2:00PM EST by filling out the google sheet below. Register here: https://docs.google.com/forms/d/e/1FAIpQLSf3uZuFUEpvoKk03s5_KtUGmTHDRn4xClhRqdCEikvZYRuMTw/viewform?usp=publish-editor
If you are having any issues with this link, please email [email protected]
The General Services Administration (GSA), Public Buildings Service (PBS) Office of Acquisition Management is seeking a construction contractor for a repair and alteration and driveway extension project at the Land Port of Entry (LPOE) in Alburgh, Vermont. Utilizing the Design-Bid-Build (DBB) delivery method, the project aims to modernize the port, correct deficiencies, and meet current standards for Customs and Border Protection (CBP) and GSA operations. The scope includes incorporating an existing facility listed on the National Register of Historic Places, installing gates and guardrails for passenger and commercial lanes, and constructing a new officer inspection booth. Work also involves interior upgrades with a new floorplan and modernized mechanical, electrical, plumbing (MEP), and security systems. The driveway extension, included as a contract option, is intended to resolve security challenges involving local residential traffic.
This solicitation, identified as 47PB5126R0008, is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1AZ for Construction of Other Administrative Facilities and Service Buildings. There is no set-aside designated for this requirement (NONE/NONE). All construction activities will take place at the port in Alburgh, VT, which will be fully closed for the duration of performance. The project must adhere to the GSA PBS Core Building Standards and the CBP 2023 Land Port of Entry Design Standard.
The response deadline for this solicitation is July 6, 2026. Administrative documentation for this opportunity includes 105 attachments, such as the Proprietary Information Agreement, Building Standards Memoranda, and several amendments issued through June 2, 2026. Access to controlled documents requires the submission of a signed Proprietary Information Agreement and an official request for each file. Emily Jackson serves as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.