Name | Type | Posted | Actions |
|---|---|---|---|
Davis-Bacon Wage Determination Curry County Building.txt | TXT | Jun 3, 2026 | |
Construction Provisions_and_Clauses FAC 2026-06.docx | DOCX | Jun 3, 2026 | |
Chetco River Boathouse Male Locker Room Dimensions.pdf | Jun 3, 2026 | ||
Chetco River Boathouse Female Locker Room Dimensions.pdf | Jun 3, 2026 | ||
Locker Room Flooring Pictures.docx | DOCX | Jun 3, 2026 | |
Roppe Wall Base Vinyl Technical Data.pdf | Jun 3, 2026 | ||
Roppe Raised Design Rubber Tile Product.pdf | Jun 3, 2026 | ||
SF1442.pdf | Jun 3, 2026 | ||
SOW STA Chetco River Replace Locker Flooring.pdf | Jun 3, 2026 |
Station Chetco River Replacement Flooring
Contact and place of performance
Ava Stow
OR 97415
USA
DESCRIPTION OF REQUIREMENT: The Contractor shall provide all labor, materials, equipment, and supervision necessary to remove the existing locker room flooring and install approximately 775 square feet of new Roppe Rubber Tile (or equal) and Roppe Vinyl Wall Base (or equal) at USCG Station Chetco River. All work must be completed in accordance with the Statement of Work, comply with industry standards, and be c...
View moreThe associated NAICS code is 238330 (Flooring Contractors). Size Standard: $19.0M. The PSC code is Z2AZ (Repair or Alteration of Other Administrative Facilities and Service Buildings).
A MANDATORY site visit will be conducted for all prospective offerors. All interested offerors must arrive no later than five minutes prior to the start time indicated. Failure to attend the mandatory site visit shall render the quoter's proposal non-responsive and ineligible for award.
Site Visit Date: 06/22/2026
Start Time: 0900
Location: U.S. Coast Guard
Station Chetco River
16133 Boat Basin Road
Brookings, OR 97415
Please E-mail Ava Stow at [email protected] to RSVP for the site visit no later than 06/18/2026.
Any and all questions regarding this solicitation shall be submitted in writing to the Contract Specialist at [email protected] with solicitation RFQ number 70Z03326QSEAT0008 in subject line. Questions regarding the statement of work (SOW) will be forwarded to the technical expert for an accurate response. All responses will be uploaded for an equal and fair solicitation to all interested vendors on solely SAM.gov. No more questions will be answered after 06/29/2026.
All quotes are due by 0700 (PST) 07/06/2026.
SUBMISSION OF QUOTES
Quotes must be submitted electronically to [email protected] by the date and time specified in this solicitation. Incomplete and Late submissions may be considered unresponsive and ineligible for award. A complete submission shall consist of the following parts:
Part 1: Price Quotation
Part 2: Technical Proposal
The Technical Proposal shall not contain any pricing information. It must provide a clear, concise narrative demonstrating the quoter’s understanding of and ability to meet the requirements of the Statement of Work (SOW). The proposal must include:
Submit quotes to the following e-mail address by the offer due date and time zone:
Attn: Ava Stow E-Mail Address: [email protected] with solicitation RFQ number 70Z03326QSEAT0008 in subject line.
The Government will evaluate the Technical Proposal on an Acceptable/Unacceptable basis. The award will be made to the lowest priced, responsible quoter whose quote conforms to all solicitation requirements and is rated 'Acceptable' technically.
It is the government’s intent to make award to the low cost responsible and responsive offeror who provides the most advantageous, reasonable, and negotiable offer to the government. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractor to be registered in SAM shall result in Contracting Officer to proceed with next successful registered offeror. Website: www.sam.gov
The U.S. Coast Guard Base Seattle is soliciting quotes under solicitation number 70Z03326QSEAT0008 for a flooring replacement project at Station Chetco River in Brookings, Oregon. The contractor must provide all labor, materials, equipment, and supervision required to remove existing locker room flooring and install approximately 775 square feet of new Roppe Rubber Tile, or an equivalent product, and Roppe Vinyl Wall Base or its equivalent. This work includes demolition, concrete substrate preparation, installation, and cleanup. All project tasks must be completed within 90 days after the Notice to Proceed and no later than October 13, 2026.
This acquisition is set aside 100% for Small Business (SBA; SBA) and is classified under NAICS 238330 Flooring Contractors and PSC Z2AZ Repair or Alteration of Other Administrative Facilities and Service Buildings. A mandatory site visit is scheduled for June 22, 2026, at the station address, and interested vendors must RSVP to Ava Stow by June 18, 2026. Failure to attend this site visit will render a quoter's proposal non-responsive and ineligible for award. The government intends to evaluate submissions on a lowest price technically acceptable basis, focusing on the quoter’s technical approach and project schedule.
Quotes are due by 0700 PST on July 6, 2026, and must be submitted electronically to the primary point of contact, Ava Stow. A complete submission package must include a signed Standard Form 1442, a detailed price breakdown for mobilization and labor, and a technical narrative demonstrating an understanding of the statement of work. Nine attachments are associated with this notice, including Davis-Bacon wage determinations, locker room dimensions, flooring photographs, and material technical data. All questions regarding the solicitation must be submitted in writing by June 29, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.