Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 02_FA286026Q0011_ Washer Dryer Cooktop Combo.pdf | May 26, 2026 | ||
Amendment 02_Attachment 3_ Contractor Price Estimate_Revision 3.xlsx | XLSX | May 26, 2026 | |
Attachment 2_ SCA Wage Determination 2015-4281 Rev 37.pdf | May 26, 2026 | ||
Amendment 02_Attachment 1_Performance Work Statement_5_26_26_ Revision 9.pdf | May 26, 2026 | ||
Top Load Washer.pdf | May 14, 2026 | ||
Stackable WD.pdf | May 14, 2026 | ||
Ventless Dryer Specs.pdf | May 14, 2026 | ||
Attachment 5_Washer Dryer Cooktop_RFI Worksheet_ Government Response.xlsx | XLSX | May 14, 2026 | |
Specs two top burners _Redacted.pdf | May 14, 2026 | ||
FA286026Q0011_ Washer Dryer Cooktop Combo Amendment 01_4_23_26.pdf | Apr 23, 2026 | ||
Attachment 1_ Performance Work Statement_4_23_26 _Revision 8.pdf | Apr 23, 2026 | ||
Attachment 2_ SCA Wage Determination 2015-4281.pdf | Apr 23, 2026 | ||
Attachment 3_Contractor Price Estimate_Revision 2.xlsx | XLSX | Apr 23, 2026 | |
Attachment 4_Base Access Form.xlsx | XLSX | Apr 23, 2026 | |
Attachment 5_Washer Dryer Cooktop_RFI Worksheet.xlsx | XLSX | Apr 23, 2026 | |
Attachment 1_ Performance Work Statement_4_14_26.pdf | Apr 14, 2026 | ||
Attachment 2_ SCA Wage Determination 2015-4281.pdf | Apr 14, 2026 | ||
Attachment 3_Contractor Price Estimate.xlsx | XLSX | Apr 14, 2026 | |
Attachment 4_Base Access Form.xlsx | XLSX | Apr 14, 2026 | |
Attachment 5_Washer Dryer Cooktop_RFI Worksheet.xlsx | XLSX | Apr 14, 2026 | |
FA286026Q0011_ Washer Dryer Cooktop Combo.pdf | Apr 14, 2026 |
316 CES Washer Dryer and Cooktops Maintenance
316 CES Washer Dryer and Cooktops Maintenance
Contact and place of performance
kala Kim
Andrews Air Force Base, MD 20762
USA
NOTICE: Amendment 02 is published. Please look at the updates on the PWS, Contractor Price Estimate Sheet, and Combo. Please update and send quotes no later than 1 June by 4:30PM EST. NOTICE: The government is extending the solicitation due to a slight requirement change. Amendment 02 will published to SAM.gov with the updated PWS as soon as the specifications have been finalized. Thank you for your interest an...
View more316 CES/CEOES require leasing, installation and maintenance of 385 combined washers, dryers, and electric cooktops on Joint Base Andrews (JBA). This requirement will require the contractor to provide furnishing of all appliances, personnel, equipment, tools, materials, supervision, transportation and all other items and services necessary to provide and install contractor owned washers, dryers, and built-in electric cook tops on (JBA). The contractor is responsible for providing and maintaining 70 Standard Washers, 2 Standard Dryers, 35 Vent-less Dryers, 11 Front-load washers, 3 ADA-Compliant Washers, 50 Washer/Dryer Combo Units for laundry center, 52 Stackable Dryer/Dryer sets, 2 Stackable Washer/Dryers, 100 Built-in Electric 2-Cook tops, and 60 Built-in 4 Electric Cook-tops. All work shall be performed IAW the Performance Work Statement (PWS) and all local, state, and federal rules and procedures as outlined in the PWS. The period of performance is three hundred and sixty-five (365) days with four (4) options years, plus the inclusion of 52.217-8 clause to extend the services of the contract up to six months.
A site visit for this solicitation will be held on 30 April 2026 at 0900. Interested parties shall complete a JBA base access request via Attachment #4 and submit to [email protected] and [email protected] no later than 27 April 2026 at 4:30pm EST. Failure to correctly complete a base access request, or to submit by 27 April 2026, may result in disqualified access to the base.
Please see the attached documents:
Washer Dryer Cooktop Combo
Attachment 1: Performance Work Statement_4_23_26_Revision 8
Attachment 2_ SCA Wage Determination 2015-4281
Attachment 3_ Contractor Price Estimate_Revision 2
Attachment 4_ Base Access Form
Attachment 5_ RFI Worksheet
The Department of the Air Force, specifically the 316 CONS PK, has issued solicitation FA286026Q0011 for the leasing, installation, and maintenance of household and commercial appliances at Joint Base Andrews, Maryland. This requirement involves providing 385 combined units, including standard and ADA-compliant washers, various dryer models such as vent-less and stackable units, and both two-burner and four-burner built-in electric cooktops. The contractor is responsible for furnishing all appliances, personnel, tools, materials, transportation, and supervision necessary to manage these contractor-owned assets in accordance with the Performance Work Statement.
The performance period consists of a 365-day base year followed by four option years, with an additional provision to extend services for up to six months. This opportunity is designated as an SBA set-aside under NAICS 532210 for Consumer Electronics and Appliances Rental and PSC W072 for the Lease or Rental of Equipment - Household and Commercial Furnishings and Appliances. Responses are due by June 1, 2026, at 4:30 PM EST.
The solicitation has undergone multiple amendments to update the Performance Work Statement, price estimate sheets, and equipment specifications. A total of 21 attachments are associated with the notice, including SCA Wage Determinations, revision logs, and technical illustrations of current spatial configurations. While illustrative documents were provided to demonstrate dimensions and technical specifications, the government will evaluate all offers that meet or exceed the minimum performance and dimensional requirements outlined in the finalized PWS.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.