Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P8626R0003_Amd_0001.pdf | May 26, 2026 | ||
B08_Att_12_PSP_Vol_II_SF24_140P8626R0003.pdf | May 22, 2026 | ||
B08_Att_11_PSP_Vol_II_LOS_140P8626R0003.xlsx | XLSX | May 22, 2026 | |
B08_Att_10_PSP_Vol_II_GenRefs_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_09_PSP_Vol_II_52_222-38_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_08_PSP_Vol_II_52_209-13_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_07_PSP_Vol_I_PastPerf_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_01_Specifications_140P8626R0003.pdf | May 22, 2026 | ||
B08_Att_05_PSP_Vol_I_Exp_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_04_PSP_Cover_140P8626R0003.docx | DOCX | May 22, 2026 | |
B08_Att_02_Drawings_140P8626R0003.pdf | May 22, 2026 | ||
B08_Att_03_WD_CA20260007_mod_3_rev_23_Jan_2026.pdf | May 22, 2026 | ||
Sol_140P8626R0003.pdf | May 22, 2026 | ||
B08_Att_06_PSP_Vol_I_KeyPers_140P8626R0003.docx | DOCX | May 22, 2026 |
Z--Conlon Creek Culvert Removal & Restoration, GOGA
Contact and place of performance
Rankin, Quinn
Not specified
CONLON CREEK CULVERT REMOVAL & RESTORATION, GOLDEN GATE NATIONAL RECREATION AREA This Amendment 0001 is to: 1. CHANGE THE SITE VISIT DATE from June 15 to Thursday, June 4, 2026, at 10:00 AM PDT. 2. No other changes have been made. HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available for download from the Attachments section on this page....
View moreThe National Park Service has issued solicitation 140P8626R0003 for the Conlon Creek Culvert Removal and Restoration project at the Golden Gate National Recreation Area. This requirement involves heavy and civil engineering construction and canal repair or alteration, classified under NAICS 237990 (Other Heavy and Civil Engineering Construction) and PSC Z2KB (Repair or Alteration of Canals). The opportunity is designated as a Small Business Administration (SBA) set-aside.
The scope of work encompasses the removal of culverts and subsequent restoration activities within the specified recreation area. A site visit is scheduled for Thursday, June 4, 2026, at 10:00 AM PDT, with specific meeting details and RSVP instructions provided in the solicitation documentation. Proposals must be submitted by the response deadline of June 22, 2026.
Contract Specialist Quinn Rankin serves as the point of contact for this requirement. The solicitation includes 14 attachments, such as technical specifications, past performance volumes, and administrative forms, which were published between May 22 and May 26, 2026. Amendment 0001 was specifically issued to update the site visit schedule.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.