Name | Type | Posted | Actions |
|---|---|---|---|
J.001 Critical Power Systems Statement of Work (SOW) Rev 1. 10-16-2024.docx | DOCX | Oct 16, 2024 | |
J.024 Price Proposal Critical Power Systems Cost Worksheet 10-11-24.xlsx.xlsx | XLSX | Oct 16, 2024 | |
6973GH-24-R-00177 REVISED SIR.pdf | Oct 16, 2024 | ||
CPS SIR 6973GH-24-R-00177 Questions and Answers 10.16.24.xlsx | XLSX | Oct 16, 2024 | |
6973GH-24-R-00177 Amendment P00001.pdf | Oct 16, 2024 | ||
J.021 FST Program Specifications for Construction.pdf | Sep 17, 2024 | ||
J.020 Fuel Storage Tank Guidelines.pdf | Sep 17, 2024 | ||
J.019 FAA Order JO 6950.2F Electrical Power Policy lmplementation at NationalAirspace System Facilities.pdf | Sep 17, 2024 | ||
J.018 FAA Order JO 1050.17B - Environmental Compliance at Air Traffic Organization Facilities.pdf | Sep 17, 2024 | ||
J.017 FAA Order JO 6950.27B - Power System Studies.pdf | Sep 17, 2024 | ||
J.016 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf | Sep 17, 2024 | ||
J.015 FAA Order JO 3900.57A CHG 1 - EOSH Requirements in the Planning & Execution of Construction & Maintenance Activities at NAS Facilities.pdf | Sep 17, 2024 | ||
J.014 FAA Order 1050.10D - Environmental Pollution Control and Abatement at FAA Facilities.pdf | Sep 17, 2024 | ||
J.013 FAA-STD-002H Standard Engineering Drawing Preparation & Support.pdf | Sep 17, 2024 | ||
J.012 FAA-C-1391e INSTALLATION, TERMINATION, SPLICING, AND TRANSIENTSURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES.pdf | Sep 17, 2024 | ||
J.011 FAA-C-1217H Construction Specification - ELECTRICAL WORK, PREMISES WIRING.pdf | Sep 17, 2024 | ||
J.010 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc | DOC | Sep 17, 2024 | |
J.009 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf | Sep 17, 2024 | ||
J.26 Past Performance Questionnaire 5-31-24.docx | DOCX | Sep 17, 2024 | |
J.007 Performance Bond - FAA Form Number FAA 4400-63.pdf | Sep 17, 2024 | ||
J.006 Travel Authorization Form.xlsx | XLSX | Sep 17, 2024 | |
J.005 Contractor Acceptance Inspection (CAI) FAA Form 6010-5.pdf | Sep 17, 2024 | ||
J.029 FAA cleanup schedule - ACEPS support.pdf | Sep 17, 2024 | ||
J.028 Technical Approach Evaluation Worksheets rev2 06-04-24.docx | DOCX | Sep 17, 2024 | |
J.027A-2 Technical Approach, Factor 3, Installation Proposal Form.pdf | Sep 17, 2024 | ||
J.027A-1 Phase 2 Volume 2, Technical Approach - Factor 2 Category 2 CPS Design Proposal Form.pdf | Sep 17, 2024 | ||
J.004 Government Furnished Equipment (GFE).pdf | Sep 17, 2024 | ||
J.003 Data Item Description (DID).pdf | Sep 17, 2024 | ||
J.002 Contract Data Requirements List (CDRL).pdf | Sep 17, 2024 | ||
J.001 Critical Power Systems Statement of Work (SOW).docx | DOCX | Sep 17, 2024 | |
6973GH-24-R-00177 as of 9-17-2024.pdf | Sep 17, 2024 | ||
J.008 Payment Bond - FAA Form Number 4400-61.pdf | Sep 17, 2024 | ||
J.025 Phase I, Volume II - Relevant Corporate Experience Form.docx | DOCX | Sep 17, 2024 | |
J.024 Price Proposal Critical Power Systems Cost Worksheet.xlsx | XLSX | Sep 17, 2024 | |
J.023 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf | Sep 17, 2024 | ||
J.022 Contractor Release - DOT FORM 4220.4.pdf | Sep 17, 2024 |
CRITICAL POWER SYSTEMS INSTALLATION SERVICES
Contact and place of performance
Stefanie Wiles
USA
Amendment P00001 posted on 10/16/2024 @ 4:41 pm CST with the following information: 1.) Uploaded the CPS SIR 6973GH-24-R-00177 Questions & Answers 10.16.24 excel spreadsheet. 2.) Uploaded a revised copy of the SOW titled "J.001 Critical Power Systems Statement of Work (SOW) Rev 1. 10-16-2024". 3.) Uploaded a revised copy of the CPS cost worksheet titled "J.024 Price Proposal Critical Power Systems Cost Worksheet 10-1...
View moreThe Federal Aviation Administration (FAA), through the 6973GH Franchise Acquisition Services office, is soliciting proposals for project management, design services, and installation/construction work for critical power systems. This requirement supports FAA Facility Power Systems programs and includes the installation of power system ancillary equipment and structures at National Airspace System (NAS) facilities located throughout the United States and its territories. This procurement is classified under NAICS 238210, Electrical Contractors and Other Wiring Installation Contractors, and PSC N061, Installation of Equipment- Electric Wire and Power Distribution Equipment.
The agency anticipates awarding a firm-fixed-price, multiple-award Indefinite Delivery/Indefinite Quantity (ID/IQ) contract. This solicitation, identified by number 6973GH-24-R-00177, is governed by the FAA Acquisition Management System (AMS) rather than the Federal Acquisition Regulation (FAR). Recent amendments to the solicitation have revised the statement of work, price proposal cost worksheet, and specific evaluation and formatting sections. Documentation for the opportunity includes 36 attachments, such as revised program specifications for construction and a formal questions and answers log.
Phase 1 proposals must be submitted via email to the designated points of contact, Amanda Garen and Stefanie Wiles, by the updated response deadline of 6:00 p.m. Central Time on October 30, 2024. Offerors are required to be registered in the System for Award Management (SAM) by the date established for submittals. As the FAA does not utilize sealed bidding techniques, there will be no public bid opening for this solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.