Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
TASK ORDER AWARD OF IT COOP&GENERATOR INSTALLATION PROJECT. THIS REQUIREMENT SHALL PROVIDE BOTH PRIME POWER AND BACK-UP POWER TO THREE SYSTEMS LOCATED IT COOP COMPOUND. ONE OF THE SYSTEMS IS CURRENTLY OPERATING ON GENERATOR POWER ONLY AT THE SITE. THE PROJECT SHALL INCLUDE ALL SITE PREPARATION, EXCAVATION, BACKFILLING, TRENCHING, PLACEMENT OF CONCRETE, DEMOLITION AND INSTALLATION OF SECTIONS OF FENCING, INSTALLATION OF POWER CONDUIT, INSTALLATION OF ELECTRICAL EQUIPMENT (TRANSFORMER, PANELS, ATS, GENERATOR, AND ALL ASSOCIATED FEEDERS), GROUNDING SYSTEM, DISCONNECTION AND REMOVAL OF A DAMAGED TRANSFORMER, DISCONNECTION OF THREE EXISTING GENERATORS, DISCONNECTION, REMOVAL, AND REPLACEMENT OF AN EXISTING PANEL, AND OTHER TASKS AS REQUIRED TO COMPLETE THE PROJECT AND TO PROVIDE A COMPLETE, OPERABLE SYSTEM.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
IOIMMEDIATE OFFICE OF THE SECRETARY OF DEFENSE
Code: 97AD