Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| IGF::OT::IGF UPGRADES TO THE MAIN SUBSTATION BUILDING 1870 AND SWITCHING STATION BUILDING 3297 AT JOINT BASE ANDREWS, MARYLAND | MTNT ENERGY, LLC | $21,385,397 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | Sep 29, 2014 | Sep 29, 2014 | Aug 3, 2019 | ||
| ELECTRICAL SUPPORT SERVICES | MTNT ENERGY, LLC | $36,130 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Jul 14, 2014 | Jun 30, 2014 | Jul 2, 2015 | ||
| CONNECT PRIME POWER AT BAGRAM AIRFIELD TO THE EASTERN HOUSING COMMUNITY AREA. | MTNT ENERGY, LLC | $130,445 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | May 30, 2014 | May 23, 2014 | Jun 22, 2014 | ||
| TASK ORDER AWARD OF IT COOP&GENERATOR INSTALLATION PROJECT. THIS REQUIREMENT SHALL PROVIDE BOTH PRIME POWER AND BACK-UP POWER TO THREE SYSTEMS LOCATED IT COOP COMPOUND. ONE OF THE SYSTEMS IS CURRENTLY OPERATING ON GENERATOR POWER ONLY AT THE SITE. THE PROJECT SHALL INCLUDE ALL SITE PREPARATION, EXCAVATION, BACKFILLING, TRENCHING, PLACEMENT OF CONCRETE, DEMOLITION AND INSTALLATION OF SECTIONS OF FENCING, INSTALLATION OF POWER CONDUIT, INSTALLATION OF ELECTRICAL EQUIPMENT (TRANSFORMER, PANELS, ATS, GENERATOR, AND ALL ASSOCIATED FEEDERS), GROUNDING SYSTEM, DISCONNECTION AND REMOVAL OF A DAMAGED TRANSFORMER, DISCONNECTION OF THREE EXISTING GENERATORS, DISCONNECTION, REMOVAL, AND REPLACEMENT OF AN EXISTING PANEL, AND OTHER TASKS AS REQUIRED TO COMPLETE THE PROJECT AND TO PROVIDE A COMPLETE, OPERABLE SYSTEM. | MTNT ENERGY, LLC | $395,375 | DEPT OF THE ARMY | IMMEDIATE OFFICE OF THE SECRETARY OF DEFENSE | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Apr 2, 2014 | Apr 2, 2014 | Jul 1, 2014 | ||
| PARTS FOR PHILADELPHIA USACE ENGINEERING - TOOLS | MTNT ENERGY, LLC | $8,751 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 561499All Other Business Support Services | 5110HAND TOOLS, EDGED, NONPOWERED | Mar 14, 2014 | Mar 14, 2014 | Apr 5, 2014 | ||
| CONTRACTOR SHALL PROVIDE AND INSTALL A NEW OVERHEAD FEEDER IAW ATTACHED REFERENCED DRAWING (SOW ANDF-P OVERHEAD FEEDER.PPTX) :. NEW FEEDER SHALL BE RATED TO CARRY 600A CONTINUOUSLY AT 15KV. GRID CONFIGURATION SHALL OCCUR TO ALLOW FOR CAMP SABALU-HARRISON TO BE POWERED FROM EXISTING 5MW POWER PLANT UPON COMPLETION OF OVERHEAD INSTALLATION. CONTRACTOR SHALL BE RESPONSIBLE FOR MARKING AND LABELING ALL SWITCHES ASSOCIATED WITH ANY SWITCHGEAR AFFECTED BY THIS CHANGE WITH THE APPROPRIATE NORMALLY OPEN OR NORMALLY CLOSED CONDITION AS WELL AS BEING FED FROM AND FEEDING AS IT APPLIES TO THE ASSOCIATED CIRCUIT. | MTNT ENERGY, LLC | $294,981 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Feb 14, 2014 | Feb 14, 2014 | Mar 16, 2014 | ||
| UPS BATTERIES AND DISPOSAL OF OLD | MTNT ENERGY, LLC | $55,651 | DEPT OF DEFENSE EDUCATION ACTIVITY (DODEA) | DEPT OF DEFENSE EDUCATION ACTIVITY (DODEA) | — | 238290Other Building Equipment Contractors | 6150MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT | Sep 30, 2013 | Sep 30, 2013 | Sep 30, 2013 | ||
| HAYDEN KZ2A TRANSFORMER REPLACEMENT- HAYDEN SUBSTATION STAGE 05 IGF::OT::IGF | MTNT ENERGY, LLC | $3,040,297 | ENERGY, DEPARTMENT OF | ENERGY, DEPARTMENT OF | — | 237130Power and Communication Line and Related Structures Construction | Y1NZCONSTRUCTION OF OTHER UTILITIES | Sep 17, 2013 | Sep 17, 2013 | May 31, 2016 | ||
| CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY CABLE AND COMPONENTS TO CONNECT THE SECONDARY SIDE OF EXISTING TRANSFORMER LABELED TX-16-12-.02 TO THE TRITON ATS CONTROL MODULE LOCATED ON THE SIDE OF BUILDING #26438. CONTRACTOR SHALL SAW CUT THE EXISTING CONCRETE PAD AS NECESSARY, AND FULLY REPAIR AFTER INSTALLATION. CONTRACTOR SHALL DISCONNECT EXISTING FEED FROM ATS AND ITS SOURCE. CONTRACTOR SHALL CUT EXISTING FEED BELOW GRADE AND LEFT IN PLACE. | MTNT ENERGY, LLC | $26,987 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Jun 26, 2013 | Jun 26, 2013 | Jul 25, 2013 | ||
| FY12-263 | MTNT ENERGY, LLC | $152,786 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Feb 27, 2013 | Feb 19, 2013 | Apr 1, 2013 | ||
| SOW FY 12-281 ELECTRICAL REPAIRS AREA 82 | MTNT ENERGY, LLC | $1,576,350 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Sep 30, 2012 | Sep 28, 2012 | Mar 27, 2013 | ||
| SOW 12-270, REF SOLAR UNIT FOR FT DEVENS | MTNT ENERGY, LLC | $463,705 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221119 | S112UTILITIES- ELECTRIC | Sep 28, 2012 | Sep 27, 2012 | Mar 27, 2014 | ||
| FY12-194 | MTNT ENERGY, LLC | $10,988 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Sep 20, 2012 | Sep 18, 2012 | Oct 4, 2012 | ||
| SOW 12-184 MICRO GENERATOR SERVICES | MTNT ENERGY, LLC | $37,787 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Sep 18, 2012 | Sep 17, 2012 | Jan 26, 2013 | ||
| ESS - FY12-183, FEEDER 14 EMERGENCY REPAIR | MTNT ENERGY, LLC | $7,106 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 21, 2012 | Aug 20, 2012 | Sep 6, 2012 | ||
| FY12-155 CAMP VANCE TRANSFORMER | MTNT ENERGY, LLC | $22,081 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 20, 2012 | Aug 20, 2012 | Dec 19, 2012 | ||
| SOW FY 12-156 EMERGENCY POWER FOR JOC HVAC | MTNT ENERGY, LLC | $51,498 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 9, 2012 | Aug 8, 2012 | Aug 10, 2012 | ||
| FY12 187 EAST SIDE PMO OFFICE RISER | MTNT ENERGY, LLC | $11,805 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 3, 2012 | Aug 2, 2012 | Aug 13, 2012 | ||
| FY12 195 ER POWER POLE RELOCATION | MTNT ENERGY, LLC | $14,726 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 3, 2012 | Jul 27, 2012 | Jul 27, 2012 | ||
| FY12 248 RSOI FEEDER | MTNT ENERGY, LLC | $1,070,203 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 3, 2012 | Jul 30, 2012 | Aug 29, 2012 | ||
| FY12 202 JOC ER REPLACE | MTNT ENERGY, LLC | $15,223 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 3, 2012 | Aug 2, 2012 | Aug 16, 2012 | ||
| ESS FY12-205 | MTNT ENERGY, LLC | $202,943 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 2, 2012 | Aug 2, 2012 | Dec 1, 2012 | ||
| SOW 12-0182 FEEDER 20 POLES CONDUCTOR EMERGENCY REPAIR | MTNT ENERGY, LLC | $12,683 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Aug 1, 2012 | Aug 1, 2012 | Aug 14, 2012 | ||
| THIS PROJECT CONSISTS OF ADDING A UTILITY GRID CONNECTION TO SUPPLY POWER TO THE TECHNICAL CONTROL FACILITY 2 S (TCF2 S) UNINTERRUPTABLE POWER SUPPLY (UPS) SYSTEM ON KANDAHAR AIRFIELD, AFGHANISTAN. | MTNT ENERGY, LLC | $566,585 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Jul 31, 2012 | Jul 31, 2012 | Oct 1, 2012 | ||
| ESS, FY12-215 | MTNT ENERGY, LLC | $416,098 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221122Electric Power Distribution | N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | Jul 27, 2012 | Jul 26, 2012 | Aug 26, 2012 |