Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
PROJECT # 112840 THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT AND ALL OPERATIONS NECESSARY TO PROVIDE ON-CALL MAINTAIN AND REPAIR ROADS, PARKING LOTS, SIDEWALKS, PAVEMENTS AND GROUNDS IN ACCORDANCE WITH PROJECT NUMBER 112840 DETAILED SPECIFICATIONS AND DRAWINGS AT WRIGHT-PATTERSON AFB, OH 45433. A. WORK LOCATION: AREA A BUILDING 271 PARKING LOT 14 A B. WORK DESCRIPTION: RESURFACE PARKING LOT PROVIDE TACK COAT ODOT-407 PROVIDE ASPHALT TYPE I DEPTH 2 INCHES PROVIDE PAVEMENT MARKINGS PERFORMANCE PERIOD 30 DAYS C. SUMMARY OF WORK QUANTITIES: BID ITEM DESCRIPTION QUANTITY 0003AH RELOCATE SIGN 20 EA 0003AJ RELOCATE POST 20 EA 0003BD PROVIDE COLD MILLING 2,000 SY 0003BJ PROVIDE TACK COAT ODOT-407 2,280 GAL 0003BN PROVIDE ASPHALT TYPE I 2,700 TON 0003CJ PROVIDE 4 INCH WHITE LINE 15,000 LF 0003DX REBUILD AND ADJUST INLET 8 EA 0003CK PROVIDE PAVEMENT SYMBOL 8 EA 0003AW REMOVE CURB AND GUTTER 200 LF 0003BW PROVIDE CURB AND GUTTER 200 LF 0003CH PROVIDE STOP BAR 25 LF 0003CM PROVIDE CROSSWALK 50 LF 0003DY REBUILD AND ADJUST MANHOLE 2 EA
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE AIR FORCE
Code: 5700
Funding Agency
DODEPT OF THE AIR FORCE
Code: 5700
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|