Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PAVING - RESTRIPING MAINSIDE AREA NWS EARLE | ASCEND CONSTRUCTION MANAGEMENT INC | $254,373 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Apr 30, 2012 | ||
| REPAIR LEVITOW STREET, PH2 | KAJIMA ROAD CO.,LTD. | $147,438 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Nov 28, 2012 | ||
| BASE : INSTALL RUNWAY | WINDAMIR DEVELOPMENT INC | $946,445 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | May 30, 2012 | ||
| REMOVE CURVE ON RANGE ROAD | ROME MANAGEMENT ASSOCIATES, L. L. C. | $36,318 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238990All Other Specialty Trade Contractors | Z222 | Sep 30, 2011 | Sep 30, 2011 | Jan 31, 2012 | ||
| COMBINATION CURB AND GUTTER | FIRVIDA CONSTRUCTION CORP | $10,338 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Dec 30, 2011 | ||
| PROJECT TITLE: ROAD REPAIR - SUSIE PEAK ROAD, BELLE FOURCHE RESERVOIR, BELLE FOURCHE UNIT, SOUTH DAKOTA THE WORK INCLUDES THE FOLLOWING: TOE DRAIN INSTALLATION ALONG SUSIE PEAK ROAD AT STA. 40+50, 91+00, AND 109+50. 1. REMOVE AND STORE GRAVEL SURFACE. 2. EXCAVATING 420 FT OF PIPE TRENCH ACROSS AND ALONG BOTH SIDES OF SUSIE PEAK ROAD. 3. INSTALLATION OF DRAINAGE FABRIC WRAP IN TRENCH AROUND DRAINAGE MATERIAL AND PIPE. 4. PLACING 40 CYD OF DRAINAGE MATERIAL AROUND PIPE. 5. INSTALLING 300 FT OF DOUBLE WALLED, PERFORATED, CORRUGATED HDPE PIPE. 6. INSTALL 180 FT OF DOUBLE WALLED, CORRUGATED HDPE PIPE. 7. COMPACT AND FILL 420 FT LONG PIPE TRENCH. 8. REPAIR AND GRAVEL ROAD EMBANKMENT DISTURBED BY EXCAVATION. 9. SHAPE CROWN OF ROAD IN AREAS REPAIRED AND GRAVELED. 10. PLACE SALVAGE SOIL AT THE DITCHES AND OTHER DISTURBED AREAS. 11. REFORM ANY DITCHES DISTURBED BY WORK. | COMPLETE CONCRETE, INC. | $47,298 | BUREAU OF RECLAMATION | BUREAU OF RECLAMATION | — | 238910Site Preparation Contractors | Z222 | Sep 30, 2011 | Sep 30, 2011 | Nov 20, 2011 | ||
| REPAIR PARKING LOT, F. 1334 | PEMBROKE CONSTRUCTION COMPANY, INCORPORATED | $175,414 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Nov 14, 2011 | ||
| CIVIL WORKS. | SOUTHERN CONTRACTING, LLC | $2,940,375 | VETERANS AFFAIRS, DEPARTMENT OF | VETERANS AFFAIRS, DEPARTMENT OF | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Aug 5, 2013 | ||
| RKMF 11-0180, RPR PVMT S FLTLN | ACE ENGINEERING INC | $112,853 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | May 30, 2012 | ||
| RPR PAVEMENT T-WEST | ACE ENGINEERING INC | $490,118 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Jul 10, 2012 | ||
| 11-1148A SLURRY FIREFIGHTER RD | ROCKWOOD GENERAL CONTRACTORS, INC. | $123,414 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Jun 8, 2012 | ||
| DESIGN-BUILD PARKING LOT | LANGMAN CONSTRUCTION INC | $667,999 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Jun 7, 2011 | Oct 31, 2011 | ||
| REPLACE ASP SEC 75 BLOW 3IN UNDER 2K SY | ALAMO CITY CONSTRUCTORS, INC. | $145,159 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Aug 10, 2012 | ||
| CONSTRUCT BITUMINOUS ASPHALT | FIRVIDA CONSTRUCTION CORP | $879,076 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Jun 15, 2013 | ||
| BASE YEAR CCI WATERFRONT MCJOC | CCI GROUP, LLC | $163,515 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 236210Industrial Building Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Nov 14, 2011 | ||
| WIDENING AEROSPACE BLVD | W.A. ROBBINS CONSTRUCTION CO., INC. | $95,455 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 236220Commercial and Institutional Building Construction | Z222 | Sep 30, 2011 | Sep 29, 2011 | Jan 27, 2012 | ||
| PARK ROAD PAVING AT HIGHVIEW, WAXAHACHIE CREEK AND LITTLE MUSTANG PARKS AT BARDWELL LAKE, ENNIS, TEXAS | JSR, INC. | $362,120 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Dec 29, 2011 | ||
| BATTALION AVE. TRAFFIC CONTROL INSTALL, RECONFIGURATION, MESSAGE BOARDS,&WARNING LIGHTS AT FORT HOOD, TEXAS | MILCON CONSTRUCTION, LLC | $2,084,357 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Nov 4, 2012 | ||
| CONSTRUCT BITUMINOUS ASPHALT | FIRVIDA CONSTRUCTION CORP | $765,557 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Aug 31, 2012 | ||
| REPAIR AIRFIELD APRON PAVEMENT&SEALANT | DAVTEK CORPORATION | $164,668 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 29, 2011 | Jan 28, 2012 | ||
| PROJECT #112851 THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT AND ALL OPERATIONS NECESSARY TO PROVIDE ON-CALL MAINTAIN AND REPAIR ROADS, PARKING LOTS, SIDEWALKS, PAVEMENTS AND GROUNDS IN ACCORDANCE WITH PROJECT NUMBER 112851 DETAILED SPECIFICATIONS AND DRAWINGS AT WRIGHT-PATTERSON AFB, OH 45433. A. WORK LOCATION: SKEEL AVENUE FROM BUILDING 109 TO BUILDING 22 B. WORK DESCRIPTION: RESURFACE SKEEL AVENUE ADD BIKE LANES PROVIDE COLD MILLING DEPTH 2 INCHES PROVIDE TACK COAT ODOT-407 PROVIDE ASPHALT TYPE I DEPTH 2 INCHES PROVIDE SIGNAGE AND SYMBOLS PROVIDE PAVEMENT MARKINGS PERFORMANCE PERIOD 30 DAYS C. SUMMARY OF WORK QUANTITIES: BID ITEM DESCRIPTION QUANTITY 0003AK PROVIDE SIGN 10 EA 0003AL PROVIDE POST 10 EA 0003BD PROVIDE COLD MILLING 7,425 SY 0003BJ PROVIDE TACK COAT ODOT-407 1,060 GAL 0003BN PROVIDE ASPHALT TYPE I 990 TON 0003CE PROVIDE YELLOW CENTERLINE 1,400 LF 0003CL PROVIDE PAVEMENT LETTERS 66 EA 0003CJ PROVIDE SOLID WHITE LINE 4,100 LF 0003DX REBUILD AND ADJUST INLET 13 EA 0003CK PROVIDE PAVEMENT ARROWS 8 EA | DIAZ ENTERPRISES INC | $145,832 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238110Poured Concrete Foundation and Structure Contractors | Z222 | Sep 30, 2011 | Sep 30, 2011 | Oct 30, 2011 | ||
| LEVEL CONCRETE BETWEEN GARAGE BAY AREAS OF B-69, MCB QUANTICO. VA | ENVIRONMENTAL DESIGN & CONSTRUCTION, L.L.C. | $5,333 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Nov 16, 2011 | ||
| GOLF CART PATH REALIGNMENT AND REPAIR OF STORM DRAIN | ENVIRONMENTAL DESIGN & CONSTRUCTION, L.L.C. | $66,276 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Oct 5, 2012 | ||
| PROVIDE NEW 6 FOOT WHEEL STOP | CSE CONSTRUCTION CO., INC. | $3,662 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 238110Poured Concrete Foundation and Structure Contractors | Z222 | Sep 30, 2011 | Sep 30, 2011 | Dec 31, 2011 | ||
| IDIQ PAVING CONTRACT, FORT RUCKER, AL | WIREGRASS CONSTRUCTION COMPANY, INC. | $79,453 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 30, 2011 | Sep 30, 2011 | Feb 28, 2012 |