Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
THIS CONTRACT IS TO SUPPLY AND INSTALL A THIRD GENERATOR THAT IS IDENTICAL TO THE TWO EXISTING CUMMINS GENERATORS. THROUGH A SELECTOR MASTER SWITCH, THE PLANT OPERATOR IS TO HAVE THE OPTION OF RUNNING G1/G2, G1/G3 OR G2/G3 COMBINATION. THE SWITCHGEAR PARALLELING SCHEME LOAD DEMAND SCHEMES IS TO STAY INTACT. THE WORK SHALL INCLUDE CONNECTING THE THIRD GENERATOR WITH THE EXISTING FUEL SYSTEM AND SWITCHBOARD. PROVIDE CONCRETE PAD AND DRAINAGE.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
SDSTATE, DEPARTMENT OF
Code: 1900
Funding Agency
SDSTATE, DEPARTMENT OF
Code: 1900
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|