Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EXTERIOR REPAIR AND PAINTING OF 9 PROPERTIES AT THE USCG ERBIL | BERAT CONTRACTING LTD | $36,305 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 236118Residential Remodelers | Z1JZMAINTENANCE OF MISCELLANEOUS BUILDINGS | Aug 22, 2023 | Aug 22, 2023 | Jul 30, 2024 | ||
| ERBIL FAC - SWIMMING POOL MECHANICAL REPAIRS | BERAT CONTRACTING LTD | $10,521 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 713940Fitness and Recreational Sports Centers | Z1PAMAINTENANCE OF RECREATION FACILITIES (NON-BUILDING) | Jan 25, 2022 | Jan 25, 2022 | Feb 28, 2022 | ||
| ERBIL FAC - EXTERIOR PAINTING OF SEVEN BUILDINGS (PHASE II) | BERAT CONTRACTING LTD | $23,646 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 561790Other Services to Buildings and Dwellings | Z1JZMAINTENANCE OF MISCELLANEOUS BUILDINGS | Sep 23, 2021 | Sep 23, 2021 | Dec 15, 2021 | ||
| ERBIL RSO - ZERAVANY CAMP GENERATOR MAINTENANCE | BERAT CONTRACTING LTD | $4,876 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 335312Motor and Generator Manufacturing | J059MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | Aug 17, 2021 | Aug 17, 2021 | May 10, 2022 | ||
| ERBIL FAC-VOLLEYBALL COURT SAND REPLACEMENT @ PROPERTY S-083 | BERAT CONTRACTING LTD | $19,223 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 713990All Other Amusement and Recreation Industries | Z1PAMAINTENANCE OF RECREATION FACILITIES (NON-BUILDING) | Jun 30, 2021 | Jun 30, 2021 | Sep 30, 2021 | ||
| ERBIL FAC - INSTALLATION OF SEVEN ADDITIONAL HATS | BERAT CONTRACTING LTD | $82,109 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 332439Other Metal Container Manufacturing | N081INSTALLATION OF EQUIPMENT- CONTAINERS, PACKAGING, AND PACKING SUPPLIES | Jun 23, 2021 | Jun 23, 2021 | Aug 31, 2021 | ||
| PERIMETER WALL IMPROVEMENT AT S-68 -ERBIL/RSO | BERAT CONTRACTING LTD | $10,545 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 811490Other Personal and Household Goods Repair and Maintenance | N099INSTALLATION OF EQUIPMENT- MISCELLANEOUS | Mar 26, 2019 | Mar 26, 2019 | Apr 7, 2019 | ||
| THIS CONTRACT IS TO SUPPLY AND INSTALL A THIRD GENERATOR THAT IS IDENTICAL TO THE TWO EXISTING CUMMINS GENERATORS. THROUGH A SELECTOR MASTER SWITCH, THE PLANT OPERATOR IS TO HAVE THE OPTION OF RUNNING G1/G2, G1/G3 OR G2/G3 COMBINATION. THE SWITCHGEAR PARALLELING SCHEME LOAD DEMAND SCHEMES IS TO STAY INTACT. THE WORK SHALL INCLUDE CONNECTING THE THIRD GENERATOR WITH THE EXISTING FUEL SYSTEM AND SWITCHBOARD. PROVIDE CONCRETE PAD AND DRAINAGE. | BERAT CONTRACTING LTD | $342,707 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 236220Commercial and Institutional Building Construction | Y1NZCONSTRUCTION OF OTHER UTILITIES | Sep 27, 2018 | Sep 25, 2018 | Dec 26, 2018 | ||
| THIS CONTRACT IS TO SUPPLY AND INSTALL A SWITCHGEAR THAT HAS BOTH SYNCHRONIZING AND DISTRIBUTION SECTIONS. THE SYNCHRONIZING SECTION SHALL BE COMPATIBLE WITH THE EXISTING TWO 1250KVA CUMMINS GENERATORS AND THE 1600KVA TRANSFORMER. AFTER INSTALLATION OF THE SWITCHGEAR INSTALL A THIRD GENERATOR THAT IS IDENTICAL TO THE TWO EXISTING CUMMINS GENERATORS. THROUGH A MASTER MANUAL SELECTOR MASTER SWITCH, THE PLANT OPERATOR IS TO HAVE THE OPTION OF RUNNING G1/G2, G1/G3 OR G2/G3 COMBINATION. | BERAT CONTRACTING LTD | $461,336 | STATE, DEPARTMENT OF | STATE, DEPARTMENT OF | — | 236220Commercial and Institutional Building Construction | Y1NZCONSTRUCTION OF OTHER UTILITIES | Sep 27, 2018 | Sep 25, 2018 | Sep 6, 2019 |