IGF::OT::IGF OTHER FUNCTIONS:(WR#C103175); CONSTRUCTION TO UPGRADE HISTED LABS 3A807&BE607 BLDG. 35A; EARL JOHNSON -HHSN292201100023I PROVIDE CONSTRUCTION SERVICES TO FURNISH AND INSTALL ITEMS OUTLINED PER THE HISTED LAB SKETCH DATED 8/27/2015 AND PURSUANT TO THE STATEMENT OF WORK DATED 10/27/2015: IN ROOM 3A807 (NORTH WALL): 1. FURNISH AND INSTALL PHENOLIC RESIN BACKSPLASH TO MATCH EXISTING BENCH TOP (WRAP COLUMN). 2. APPLY SILICON CAULK TO THE TOP AND BOTTOM OF BACKSPLASH TO MAKE BENCH TOP RIGID. 3. CUT IN NEATLY A 4 INCH DIAMETER GROMMET HOLE TO THE EXISTING BENCH TOPS WHERE INDICATED ON THE 4. HISTED LAB SKETCH DATED 8/27/2015 (3 HOLES TOTAL). 5. PROVIDE AIR AND VACUUM SERVICES TO MATCH SOUTH WALL. 6. PROVIDE AN 18 INCH WIDE MOBILE DRAWER UNIT. 7. FURNISH AND INSTALL A BENCH TOP SUPPORT POST WHERE INDICATED (1 EACH). IN ROOM 3A807 (SOUTH WALL): 1. CUT IN NEATLY A 4 INCH DIAMETER GROMMET HOLE TO THE EXISTING BENCH TOPS WHERE INDICATED ON THE 2. HISTED LAB SKETCH DATED 8/27/2015 (2 HOLES TOTAL). 3. RELOCATE AIR AND VACUUM SERVICES TO TERMINATE AT 18 INCHES BELOW HUNG CEILING. THE AIR-LINE IS 4. TO BE PROVIDED WITH A LAB GAS VALVE WITH REGULATOR AND 3/8 INCH NPT FEMALE POINT OF USE. THE VACUUM 5. LINE IS ALSO TO BE PROVIDED WITH A LAB GAS VALVE WITH 3/8INCH NPT FEMALE POINT OF USE. 6. CUT AND CAP THE CARBOGEN (CB) PIPING ABOVE CEILING. REPLACE WITH A NEW CEILING TILE. 7. FURNISH AND INSTALL TWO BENCH TOP SUPPORT POST WHERE INDICATED (2 EACH). 8. PROVIDE A NEW CEILING TILE WHERE ROUND DUCT PROTRUDES WITH A TIGHT FIT (MINIMUM 1/8 INCH GAP/SPACE). 9. PATCH WALL AND PAINT ENTIRE ROOM (MATCH EXISTING WALL PAINT COLOR). 10. ROOM IS TO BE CLEANED COMPLETELY BEFORE TURNING OVER TO THE GOVERNMENT. IN ROOM BE607 (IC TO PROVIDE LAB FURNITURE, CHAIRS/STOOLS, BEHAVIOR BOXES, COMPUTER AND WORK TABLES, OPTICAL CART): 1. REMOVE THE ALUMINUM SANI-RAILS FROM ENTIRE ROOM (TURNOVER TO THE GOVERNMENT). 2. REMOVE BROOM STOW MOUNTED ON SOUTH WALL (TURNOVER TO THE GOVERNMENT). 3. PROVIDE 12 LINEAR FEET OF 3-TIER SHELVES 12 INCHES DEEP ON THE WEST WALL. 4. PROVIDE 5 LINEAR FEET OF 3-TIER SHELVES 12 INCHES DEEP ON THE SOUTH WALL. 5. PROVIDE 3 LINEAR FEET OF 3-TIER SHELVES 12 INCHES DEEP ON THE NORTH WALL. 6. CONFIRM WALLS TO RECEIVE SHELVES HAVE SUPPORT STRAPS BEHIND FINISHED WALL. PROVIDE SUPPORT STRAPS IF NONE FOUND. 7. PROVIDE (1) WALL MOUNTED LOW POWER MICROSCOPE (SPECIFICATIONS TO BE PROVIDED BY THE I/C). 8. PROVIDE (6) 20 AMP QUAD DEDICATED RECEPTACLES (CONNECT TO 6 SPARES FROM PANEL BENLD). INSTALL RECEPTACLES PER THE HISTED LAB SKETCH DATED 8/27/2015. RECEPTACLE HEIGHTS TBD BY THE GOVERNMENT. 9. CLOSELY COORDINATE ALL OF THE ABOVE MENTIONED WORK AT ALL TIMES WITH THE NIH PO (ROOM TO BE WORKED ON FIRST TBD BY THE GOVERNMENT). 10. ROOM IS TO BE CLEANED COMPLETELY BEFORE TURNING OVER TO THE GOVERNMENT. DELIVER TO: NIH CAMPUS PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN 8363541 NINDS OD OFC DIR TAS::75-16-0892::TAS 08029220161DA0 ORDER = NTP PERFORMANCE CONSTITUTES ACCEPTANCE
Task order obligations
Period of performance
Awarding Agency
NINATIONAL INSTITUTES OF HEALTH
Code: 7529
Funding Agency
NINATIONAL INSTITUTES OF HEALTH
Code: 7529
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|
100% of period elapsed