Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| IGF::OT::IGF - TAS::75 0872::TAS - HHSN292201100023I - HHSN29200025 - C102805 - TASK ORDER - CONSTRUCTION SERVICES - BULK TANK PAD EXTERIOR FILL POINTS, BUILDING 50 - HAKAN BARDAKCI - SEE ATTACHED SOW. 1. PROVIDE AS-BUILT DRAWINGS 2. INSTALL THREE (3) REMOTE FILL CABINET ON THE EXTERIOR OF BUILDING 50 TANK PAD, ONE (1) CO2 AND TWO (2) NITROGEN 3. REMOVE EXISTING EXTENDED FILL LINE TO 1500 GALLON LN2 TANK 4. SCAN WALL WITH GPR TO DETERMINE HOLE LOCATIONS FOR INTER-CONNECTIVE PLUMBING BETWEEN CABINETS AND TANKS 5. CORE/CUT HOLES IN WALL FOR PLUMBING 6. INSTALL ALL INNER-CONNECTIVE PLUMBING BETWEEN CABINETS AND TANKS 7. INSTALL FIVE (5) BOLLARDS 8. INSTALL OXYGEN DEFICIENCY ALARM, 4 POINTS THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 09/22/2016 TO 11/22/2016. DELIVER TO: NIH CAMPUS, BUILDING 50 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8023325, NHLBI TAS::75 0872::TAS - 08027220161DA0 DUNS # 128597189 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | DRAKE, INCORPORATED | $160,922 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 21, 2016 | Sep 21, 2016 | Jun 22, 2017 | ||
| IGF::OT::IGF - ("OTHER FUNCTIONS") HHSN292201100023I, HHSN29200024, C103235; DESIGN-BUILD SERVICES TO INSTALL A PET CT SCANNER, BLDG. 10, BETHESDA CAMPUS; DOUG TOPPER; DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8024955, TAS::75 16 0849::TAS 08024920161DA0 DUNS # 128597189 WORK TO BE PERFORMED: 08/22/2016 - 01/31/2017 TASK ORDER: 08/22/2016 - 03/31/2017 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN JANUARY 31, 2017. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | DRAKE, INCORPORATED | $359,125 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Aug 17, 2016 | Aug 17, 2016 | May 31, 2017 | ||
| IGF::OT::IGF - TAS::75 0843::TAS - HHSN292201100023I - HHSN29200023 - C103641 - TASK ORDER - DESIGN/BUILD SERVICES - RENOVATION OF ROOM 1A1015, BUILDING 35 - DOUG TOPPER - SEE ATTACHED SOW. 1. REVIEW AS-BUILT DRAWINGS 2. DESIGN AND PROVIDE CONSTRUCTION DOCUMENTS (FINAL) 3. DEMOLITION - REMOVE EXISTING OFFICE FURNITURE 4. CONSTRUCTION A. PROVIDE CALCULATIONS, SPECIFICATIONS, MECHANICAL AND ELECTRICAL POINT OF CONNECTIONS FOR A FAN COIL UNIT TO SUFFICIENTLY COOL ROOM 1A1015. DRAWING SHALL BE ONE SUBMISSION, 11X17 SUBMITTED ELECTRONICALLY. B. ANY OTHER DESIGN SERVICES IS NOT REQUIRED E.G. KICK OFF MEETING, SHOP DRAWING REVIEW, RESPOND TO RFIS, PUNCH LIST OF RECORD DRAWINGS. C. PROVIDE TWO QUAD RECEPTACLES ON THE SOUTH WALL, REUSE EXISTING CIRCUITS. NO DESIGN REQUIRED. LOCATION TO BE DETERMINED BY PROJECT OFFICER. D. PROVIDE TWO DATA/LAN DROPS ON THE SOUTH WALL. NO DESIGN REQUIRED. LOCATION TO BE DETERMINED BY PROJECT OFFICER. E. POINT UP AND PAINT THE ENTIRE OFFICE WALL AND TWO DOORS AND FRAMES. MATCH EXISTING PAINT AS CLOSE AS POSSIBLE. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 7/27/2016 TO 10/31/2016. DELIVER TO: NIH CAMPUS, BUILDING 35, ROOM 1A1015 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8024375, NIA TAS::75 0843::TAS - 08024320161DA0 DUNS # 128597189 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | DRAKE, INCORPORATED | $60,607 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Jul 21, 2016 | Jul 21, 2016 | Dec 31, 2016 | ||
| IGF::OT::IGF("OTHER FUNCTIONS") - C102653 - - TASK ORDER- DESIGN-BUILD SERVICES INSTALL 2HR FIRE RATED BARRIER WALL; BLDG. 49 LOADING DOCK; FERDINAND REYES | DRAKE, INCORPORATED | $209,641 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Jun 24, 2016 | Jun 24, 2016 | Nov 30, 2017 | ||
| IGF::OT::IGF OTHER FUNCTIONS:(WR#C103175); CONSTRUCTION TO UPGRADE HISTED LABS 3A807&BE607 BLDG. 35A; EARL JOHNSON -HHSN292201100023I PROVIDE CONSTRUCTION SERVICES TO FURNISH AND INSTALL ITEMS OUTLINED PER THE HISTED LAB SKETCH DATED 8/27/2015 AND PURSUANT TO THE STATEMENT OF WORK DATED 10/27/2015: IN ROOM 3A807 (NORTH WALL): 1. FURNISH AND INSTALL PHENOLIC RESIN BACKSPLASH TO MATCH EXISTING BENCH TOP (WRAP COLUMN). 2. APPLY SILICON CAULK TO THE TOP AND BOTTOM OF BACKSPLASH TO MAKE BENCH TOP RIGID. 3. CUT IN NEATLY A 4 INCH DIAMETER GROMMET HOLE TO THE EXISTING BENCH TOPS WHERE INDICATED ON THE 4. HISTED LAB SKETCH DATED 8/27/2015 (3 HOLES TOTAL). 5. PROVIDE AIR AND VACUUM SERVICES TO MATCH SOUTH WALL. 6. PROVIDE AN 18 INCH WIDE MOBILE DRAWER UNIT. 7. FURNISH AND INSTALL A BENCH TOP SUPPORT POST WHERE INDICATED (1 EACH). IN ROOM 3A807 (SOUTH WALL): 1. CUT IN NEATLY A 4 INCH DIAMETER GROMMET HOLE TO THE EXISTING BENCH TOPS WHERE INDICATED ON THE 2. HISTED LAB SKETCH DATED 8/27/2015 (2 HOLES TOTAL). 3. RELOCATE AIR AND VACUUM SERVICES TO TERMINATE AT 18 INCHES BELOW HUNG CEILING. THE AIR-LINE IS 4. TO BE PROVIDED WITH A LAB GAS VALVE WITH REGULATOR AND 3/8 INCH NPT FEMALE POINT OF USE. THE VACUUM 5. LINE IS ALSO TO BE PROVIDED WITH A LAB GAS VALVE WITH 3/8INCH NPT FEMALE POINT OF USE. 6. CUT AND CAP THE CARBOGEN (CB) PIPING ABOVE CEILING. REPLACE WITH A NEW CEILING TILE. 7. FURNISH AND INSTALL TWO BENCH TOP SUPPORT POST WHERE INDICATED (2 EACH). 8. PROVIDE A NEW CEILING TILE WHERE ROUND DUCT PROTRUDES WITH A TIGHT FIT (MINIMUM 1/8 INCH GAP/SPACE). 9. PATCH WALL AND PAINT ENTIRE ROOM (MATCH EXISTING WALL PAINT COLOR). 10. ROOM IS TO BE CLEANED COMPLETELY BEFORE TURNING OVER TO THE GOVERNMENT. IN ROOM BE607 (IC TO PROVIDE LAB FURNITURE, CHAIRS/STOOLS, BEHAVIOR BOXES, COMPUTER AND WORK TABLES, OPTICAL CART): 1. REMOVE THE ALUMINUM SANI-RAILS FROM ENTIRE ROOM (TURNOVER TO THE GOVERNMENT). 2. REMOVE BROOM STOW MOUNTED ON SOUTH WALL (TURNOVER TO THE GOVERNMENT). 3. PROVIDE 12 LINEAR FEET OF 3-TIER SHELVES 12 INCHES DEEP ON THE WEST WALL. 4. PROVIDE 5 LINEAR FEET OF 3-TIER SHELVES 12 INCHES DEEP ON THE SOUTH WALL. 5. PROVIDE 3 LINEAR FEET OF 3-TIER SHELVES 12 INCHES DEEP ON THE NORTH WALL. 6. CONFIRM WALLS TO RECEIVE SHELVES HAVE SUPPORT STRAPS BEHIND FINISHED WALL. PROVIDE SUPPORT STRAPS IF NONE FOUND. 7. PROVIDE (1) WALL MOUNTED LOW POWER MICROSCOPE (SPECIFICATIONS TO BE PROVIDED BY THE I/C). 8. PROVIDE (6) 20 AMP QUAD DEDICATED RECEPTACLES (CONNECT TO 6 SPARES FROM PANEL BENLD). INSTALL RECEPTACLES PER THE HISTED LAB SKETCH DATED 8/27/2015. RECEPTACLE HEIGHTS TBD BY THE GOVERNMENT. 9. CLOSELY COORDINATE ALL OF THE ABOVE MENTIONED WORK AT ALL TIMES WITH THE NIH PO (ROOM TO BE WORKED ON FIRST TBD BY THE GOVERNMENT). 10. ROOM IS TO BE CLEANED COMPLETELY BEFORE TURNING OVER TO THE GOVERNMENT. DELIVER TO: NIH CAMPUS PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN 8363541 NINDS OD OFC DIR TAS::75-16-0892::TAS 08029220161DA0 ORDER = NTP PERFORMANCE CONSTITUTES ACCEPTANCE | DRAKE, INCORPORATED | $90,268 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Mar 21, 2016 | Mar 21, 2016 | Aug 24, 2016 | ||
| IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201100023I - HHSN29200020 - C103075 - TASK ORDER - DESIGN/BUILD SERVICES - CYBER CAFE RENOVATION, ROOM 1202, BUILDING 40 - COREY COSGROVE - SEE ATTACHED SOW. DELIVER TO: NIH CAMPUS, BUILDING 40, ROOM 1202 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8022419, ORF TAS::75 0838::TAS - 08023820165DB0 DUNS # 128597189 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | DRAKE, INCORPORATED | $200,938 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Mar 10, 2016 | Mar 10, 2016 | Feb 28, 2017 | ||
| IGF::OT::IGF C103234 PROVIDE ANNUAL PREVENTATIVE MAINTENANCE ON CHILLERS LOCATED IN THE CENTRAL UTILITY PLANT, BLDG 11 ALLAN BULLER-JARRETT | DRAKE, INCORPORATED | $934,680 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Nov 16, 2015 | Nov 16, 2015 | Aug 30, 2016 | ||
| IGF::OT::IGF ("OTHER FUNCTIONS") - C101319 - CORRECT BUILDING 29B WATER INFILTRATION, BLDG. 29B - LENIN ANDRADE; THIS IS A NOT-TO-EXCEED ORDER. THE CONTRACTOR IS AUTHORIZED TO PERFORM AND BILL UP TO $95,000 (NINETY-FIVE THOUSAND DOLLARS). THE CONTRACTOR SHALL BEGIN PROMPT NEGOTIATIONS WITH THE CONTRACTING OFFICER AND SUBMIT A REVISED PROPOSAL WITHIN THIRTY (30) DAYS OF CONCLUSION OF ALL NEGOTIATIONS. (SEE ATTACHED SOW). DELIVER TO: NIH CAMPUS, BLDG 29B, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8018648, TAS:: 75-1418-0838::TAS 08023820145DB0 DUNS # 128597189 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN MARCH 31, 2015. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. ***PERFORMANCE CONSTITUTES ACCEPTANCE*** | DRAKE, INCORPORATED | $114,664 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 25, 2015 | Sep 25, 2015 | Oct 31, 2016 | ||
| RECONFIGURE AND REPAIR CORRIDOR CEILINGS ON THREE FLOORS AT THE NATIONAL COMPUTER CENTER. IGF::OT::IGF | DRAKE, INCORPORATED | $158,782 | SOCIAL SECURITY ADMINISTRATION | SOCIAL SECURITY ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Sep 24, 2015 | Sep 22, 2015 | Mar 20, 2016 | ||
| IGF::OT::IGF - ("OTHER FUNCTIONS") C102956 - CONSTRUCTION SERVICES TO INSTALL IN-LINE BOOSTER PUMP IN BUILDING 35A - FERDINAND REYES; DELIVER TO: NIH CAMPUS, BLDG. 35, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8020779, TAS::75 15 0884::TAS 08024420151DA0 DUNS # 128597189 PERIOD OF PERFORMANCE: WORK 9/23/2015 - 12/31/2015 PERIOD OF PERFORMANCE: TASK ORDER 9/23/2015 - 03/31/2016 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN DECEMBER 31, 2016. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | DRAKE, INCORPORATED | $36,670 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 23, 2015 | Sep 23, 2015 | Mar 31, 2016 | ||
| IGF::OT::IGF - C102913 - CONSTRUCTION SERVICES FOR POPI PLAYGROUND RENOVATION; BLDG. 64; NIH BETHESDA CAMPUS- HAKAN BARDACKI | DRAKE, INCORPORATED | $211,000 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 16, 2015 | Sep 16, 2015 | Jan 31, 2017 | ||
| IGF::OT::IGF: ITEM #1: REQ#3766784: WR#C102335: BASE: OFFICE SPACE RENOVATIONS; BLDG 15K: PO/COR LUIS LEBRON FY2015: CAN #8020039: $26,860.00 HN76 NIMH DIRP DIV INTRAML RESCH PRGMS TAS:: 75-15-0892 :: TAS 08029220151DA0 | DRAKE, INCORPORATED | $26,708 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Jul 30, 2015 | Jul 30, 2015 | Oct 8, 2015 | ||
| REPLACE HOT WATER TANKS/IRS NEW CARROLLTON FEDERAL BUILDING IGF::OT::IGF FOR OTHER FUNCTIONS | DRAKE, INCORPORATED | $127,117 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Y1AACONSTRUCTION OF OFFICE BUILDINGS | Apr 14, 2015 | Apr 13, 2015 | Sep 1, 2015 | ||
| IGF::OT::IGF C101967 - REPAIR OR REPLACE DETERIORATED PALLET RACK SYSTEM BEFORE WINTER OPERATION BEGINS, BLDG 22 | DRAKE, INCORPORATED | $16,262 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Aug 29, 2014 | Aug 29, 2014 | Aug 28, 2015 | ||
| IGF::OT::IGF C101389 - DESIGN/BUILD FOR OFFICE RENOVATION, BLDG 30 - FOSTER AWUKU | DRAKE, INCORPORATED | $86,101 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Aug 28, 2014 | Aug 28, 2014 | Dec 31, 2015 | ||
| IGF::OT::IGF | DRAKE, INCORPORATED | $164,037 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Aug 28, 2014 | Aug 28, 2014 | Dec 31, 2015 | ||
| IGF::OT::IGF C101416 - CONSTRUCT FIVE (5) NEW OFFICES AND CONFERENCE ROOM, LOCATED IN 1N08, BLDG 38 - FOSTER AWUKU | DRAKE, INCORPORATED | $220,697 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Aug 7, 2014 | Aug 7, 2014 | Jul 15, 2016 | ||
| IGF::OT::IGF C101188; OFFICE RENOVATION DESIGN BUILD; BLDG 13; FOSTER AWUKU | DRAKE, INCORPORATED | $40,854 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Aug 7, 2014 | Aug 7, 2014 | Dec 9, 2015 | ||
| IGF::OT::IGF ("OTHER FUNCTIONS") C101278 IAN WILLIAMS TASK ORDER NCCAM STAFF RECONFIGURATION, BLDG. 10, BETHESDA, MD, NIH MAIN CAMPUS. DELIVERY TO: BLDG. 10 PRODUCT/SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS CAN: 8017759, HND1 NCCAM OD OFC DIRECTOR TAS::75-14-0896::TAS 08029620141DA0 ***TASK ORDER=NOTICE TO PROCEED (NTP) *** ***PERFORMANCE CONSTITUTES ACCEPTANCE *** | DRAKE, INCORPORATED | $66,766 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | May 22, 2014 | May 22, 2014 | Apr 21, 2015 | ||
| IGF::OT::IGF (ITEM #1) C100950; ROOM DIVIDES; BLDG 2; LENIN ANDRADE CAN 8365239 HNA OD OFFICE OF THE DIRECTOR TAS::75-3699::TAS 08056620131RA0 . | DRAKE, INCORPORATED | $172,527 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | May 7, 2014 | May 7, 2014 | Jul 31, 2015 | ||
| IGF::OT::IGF C101155 - INSTALL ACCESS PANELS IN CAGED ROOMS, BLDG 112 POOLESVILLE - CHUCK KIRBY | DRAKE, INCORPORATED | $113,383 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Apr 15, 2014 | Apr 15, 2014 | May 6, 2015 | ||
| IGF::OT::IGF TASK ORDER #46 NATIONAL COMPUTER CENTER, SECURITY CHECK POINT BUILDING MODIFICATIONS TO COMPLY WITH THE APPLICABLE AMERICAN DISABILITIES ACT (ADA) STANDARDS. | DRAKE, INCORPORATED | $63,135 | SOCIAL SECURITY ADMINISTRATION | SOCIAL SECURITY ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Mar 27, 2014 | Mar 27, 2014 | Nov 14, 2014 | ||
| IGF::OT::IGF (ITEM #1) (REQ #3196023) BASE: COMMISSIONING, BLDG 59A (C100422 AND C100790); WR#C101060; PO/COR WAYNE SMALL CAN #8017026; ORF FY2014-$116,093.00 TAS:: 75 4/80838:: TAS 08023820145DB0 | DRAKE, INCORPORATED | $242,136 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Mar 10, 2014 | Mar 10, 2014 | Feb 15, 2018 | ||
| IGF::OT::IGF C101001 - BUILDING 6 DRAINAGE SYSTEM - LENIN ANDRADE | DRAKE, INCORPORATED | $125,082 | NATIONAL INSTITUTES OF HEALTH | NATIONAL INSTITUTES OF HEALTH | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Feb 5, 2014 | Feb 5, 2014 | Sep 24, 2015 | ||
| RIPLEY CENTER DOOR HARDWARE REPAIR IGF::OT::IGF | DRAKE, INCORPORATED | $751 | SMITHSONIAN INSTITUTION | SMITHSONIAN INSTITUTION | — | 236220Commercial and Institutional Building Construction | Z1JAMAINTENANCE OF MUSEUMS AND EXHIBITION BUILDINGS | Aug 29, 2013 | Aug 27, 2013 | Sep 30, 2014 |