Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
PROJECT TITLE: ROAD REPAIR - SUSIE PEAK ROAD, BELLE FOURCHE RESERVOIR, BELLE FOURCHE UNIT, SOUTH DAKOTA THE WORK INCLUDES THE FOLLOWING: TOE DRAIN INSTALLATION ALONG SUSIE PEAK ROAD AT STA. 40+50, 91+00, AND 109+50. 1. REMOVE AND STORE GRAVEL SURFACE. 2. EXCAVATING 420 FT OF PIPE TRENCH ACROSS AND ALONG BOTH SIDES OF SUSIE PEAK ROAD. 3. INSTALLATION OF DRAINAGE FABRIC WRAP IN TRENCH AROUND DRAINAGE MATERIAL AND PIPE. 4. PLACING 40 CYD OF DRAINAGE MATERIAL AROUND PIPE. 5. INSTALLING 300 FT OF DOUBLE WALLED, PERFORATED, CORRUGATED HDPE PIPE. 6. INSTALL 180 FT OF DOUBLE WALLED, CORRUGATED HDPE PIPE. 7. COMPACT AND FILL 420 FT LONG PIPE TRENCH. 8. REPAIR AND GRAVEL ROAD EMBANKMENT DISTURBED BY EXCAVATION. 9. SHAPE CROWN OF ROAD IN AREAS REPAIRED AND GRAVELED. 10. PLACE SALVAGE SOIL AT THE DITCHES AND OTHER DISTURBED AREAS. 11. REFORM ANY DITCHES DISTURBED BY WORK.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
BOBUREAU OF RECLAMATION
Code: 1425
Funding Agency
BOBUREAU OF RECLAMATION
Code: 1425
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|