Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF OTHER FUNCTIONS THE CONTRACTOR SHALL DESIGN, BUILD, TEST, AND QUALIFY FOR FLIGHT A NEW HIGH THRUST-TO-POWER THRUSTER ON A CUBESAT. THE NEW ENGINE HAS DIRECT TRACEABILITY TO A LARGER DARPA SOLAR ELECTRIC POWER (SEP) DEMONSTRATION MISSION, WHERE LARGE AND SUSTAINED ORBIT CHANGES ARE POSSIBLE (INCLUDING NON-KEPLERIAN ORBIT MANEUVERS). THE CAT ENGINE IS DESIGNED FOR OPERATIONS AT UP TO 50 WATTS OF INPUT POWER, WHICH CAN BE TESTED ON A 3U CUBESAT WITH FIRING DURATIONS UP TO 10 MINUTES. ONCE TESTED IN LEO, THE ENGINE WILL BE READY FOR SCALING UP AND PLUG-AND-PLAY INTEGRATION ON LARGER SOLAR ELECTRIC PROPULSION (SEP) SPACECRAFT. ADDITIONAL WORK, AS DETAILED IN THE VARIOUS OPTIONS, WILL BE INCLUDED IN THIS SCOPE IF ANY OF THE OPTIONS ARE EXERCISED.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
NANATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Code: 8000
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|