Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF C2 SATCOM SYSTEM DESIGN/DEVELOP/FABRICATE/TEST THE PARTNER SHALL CONDUCT DESIGN AND DEVELOPMENT EFFORTS FOR THE C2 SATCOM SYSTEM. THE SATCOM TRANSCEIVER DESIGNS SHALL BE CONSISTENT WITH PRELIMINARY PERFORMANCE REQUIREMENTS AS SPECIFIED IN RTCA INC'S SPECIAL COMMITTEE 228 (SC-228) DOCUMENTATION, UNLESS OTHERWISE SPECIFIED BY NASA. THE TRANSCEIVERS SHALL OPERATE WITHIN PROPOSED KU&KA-BAND SATCOM FREQUENCY SPECTRUM FOR UAS (10.95-11.2 GHZ, 11.45-11.7 GHZ, 11.7-12.2 GHZ, 19.7-20.2 GHZ, 14-14.47 GHZ, AND 29.5-30.0 GHZ) AS DESIGNATED IN ITU-R WRC-2015 RESOLUTION 155, UNLESS OTHERWISE SPECIFIED BY NASA. SIMULTANEOUS OPERATION IN BOTH KU AND KA BANDS IS NOT REQUIRED. - PARTNER MILESTONES FOR THIS EFFORT SHALL CONSIST OF: 1. GENERATE PROJECT PLAN 2. DEVELOP TRADE STUDY 3. DEVELOP SYSTEM SPECIFICATIONS 4. PRELIMINARY DESIGN REVIEW 5. CRITICAL DESIGN REVIEW 6. FABRICATE PROTOTYPE 7. FIRST PROTOTYPE TEST 8. REVISION DESIGN REVIEW 9. UPDATE PROTOTYPE 10. SECOND PROTOTYPE TEST B. C2 SATCOM SYSTEM CERTIFICATION - THE C2 SATCOM HARDWARE BEING DEVELOPED UNDER THIS EFFORT IS FOR TEST AND VALIDATION ONBOARD PUBLIC-USE AIRCRAFT, THUS A SUPPLEMENTAL TYPE CERTIFICATE (STC) OR CERTIFIED HARDWARE IS NOT NECESSARY. THE INTENT OF THIS EFFORT IS TO DEVELOP SATCOM HARDWARE THAT IS ON A PATH TO CERTIFICATION. THE PARTNER SHALL CONDUCT THE DEVELOPMENT OF THE C2 SATCOM SYSTEM UNDER A PROCESS CONSISTENT WITH THE DEVELOPMENT OF A CERTIFIED RADIO. C. C2 SATCOM SYSTEM FABRICATION - THE PARTNER SHALL DELIVER TO NASA GRC THREE (3) SETS OF PROTOTYPE TRANSCEIVERS, CONSISTING OF THREE (3) AIRBORNE TRANSCEIVERS AND THREE (3) GROUND BASED TRANSCEIVERS. - THE PARTNER SHALL DELIVER TO NASA GRC THREE (3) AIRBORNE ANTENNAS. D. C2 SATCOM TIME - THE PARTNER SHALL PROVIDE SATELLITE TIME FOR THE AIRBORNE AND GROUND TESTING OF THE C2 SATCOM SYSTEM, FOR BOTH NASA AND PARTNER TESTING. E. C2 SATCOM FLIGHT TEST SUPPORT - THE PARTNER SHALL SUPPORT THE NASA GRC GROUND AND FLIGHT TESTS OF THE PROTOTYPE SATCOM SYSTEM, WITH ONSITE PERSONNEL AS REQUESTED FROM NASA, CONDUCT ANALYSIS OF DATA COLLECTED DURING THE FLIGHT TEST, AND DELIVER FLIGHT TEST REPORTS. F. C2 SATCOM STANDARDS SUPPORT - THE PARTNER SHALL SUPPORT THE DEVELOPMENT OF THE RTCA SC-228 SATCOM MOPS, BY PARTICIPATING IN RTCA SC-228 C2 TECHNICAL TELECONFERENCES AND MEETINGS, IN ORDER TO PROVIDE INFORMATION ON PROTOTYPE SATCOM SYSTEM DESIGN, DEVELOPMENT, AND RESULTS FROM TESTS OF THE PROTOTYPE EQUIPMENT. G. FREQUENCY LICENSES FOR RADIO OPERATIONS AT LOCATIONS OTHER THAN THOSE SPECIFIED UNDER NASA RESPONSIBILITIES ARE THE RESPONSIBILITY OF THE PARTNER. H. THE PARTNER SHALL PROVIDE ALL DATA NECESSARY FOR THE DEVELOPMENT OF NATIONAL AND INTERNATIONAL STANDARDS FOR C2 SATCOM SYSTEMS FOR UAS OPERATIONS IN THE NAS DEVELOPED UNDER THIS COOPERATIVE AGREEMENT. THE PARTNER SHALL MAKE THIS DATA AVAILABLE TO NASA AND TO THE RELEVANT STANDARDS BODIES (INCLUDING BUT NOT LIMITED TO RTCA, EUROCAE, ICAO, ITU-R AND AEEC.)
Estimated months remaining until end of performance.
Task order obligations
Period of performance
100% of period elapsed
Awarding Agency
NANATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Code: 8000
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|