Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF THE DEVELOPMENT OF ADVANCED SMALL SPACECRAFT WITH INCREASED CAPABILITY AND PERFORMANCE REQUIRES NEW TECHNOLOGIES AND APPROACHES TO THERMAL MANAGEMENT. NEWER AND MORE COMPLEX INTEGRATED ELECTRONICS ADD TO MISSION CAPABILITY BUT ALSO PRODUCE MORE WASTE HEAT. TRADITIONAL METHODS OF METAL HEAT PIPES OR STRUCTURES HAVE ISSUES WHEN SCALING TO ACCOMMODATE HIGHER THERMAL LOADS, ESPECIALLY IN THE VACUUM AND EXTREME CONDITIONS OF SPACE. EOTRON HAS DEVELOPED A 3D SILICON FRONT END TO A FLUID PUMP LOOP COOLING SYSTEM THAT OFFERS IMPROVED PERFORMANCE IN A COMPACT LIGHT-WEIGHT FORM FACTOR. THE PROPOSED SILICON COLD PLATE MAKES DIRECT CONTACT WITH HIGH THERMAL FLUX DEVICES AND REMOVES WASTE HEAT THROUGH A SERIES OF FLUID CHANNELS INTERNAL TO THE SILICON. THE SILICON PLATE IS BONDED TO THE SYSTEM PCB AT THERMAL VIA POINTS TO REMOVE ADDITIONAL HEAT AND PROVIDE ELECTRICAL AND SYSTEM CONNECTION TO OTHER ELECTRONIC COMPONENTS. FLUID, MOVING THROUGH SILICON'S INTERNAL CHANNELS IS THEN MOVED TO ANOTHER AREA FOR THERMAL RADIATION BY A SYSTEM PUMP. IN THIS PROPOSAL, THE COMPANY OUTLINES ITS PLANS TO DESIGN, FABRICATE AND TEST A PROTOTYPE TO PROVE ITS CAPABILITY TO REMOVE A TYPICAL HIGH THERMAL LOAD FROM A COMPACT SYSTEM ALONG WITH BASIC RELIABILITY TESTING ON THE FLUID SYSTEM. SILICON'S ADVANTAGES OF LIGHT-WEIGHT, HIGH THERMAL CONDUCTIVITY AND NONREACTIVE NATURE TO LIQUIDS MAKE IT IDEAL FOR THIS APPLICATION.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
NANATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Code: 8000
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|