Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| THE CONTRACTOR IS RESPONSIBLE FOR THE ALL OF THE LABOR, MATERIALS, SUPERVISION, EQUIPMENT, AND SUPPLIES IN ORDER TO INSTALL ONE (1) ADDITIONAL CAMERA FOR CCTV FOR SSA DALY CITY. | MIE, INC. | $8,450 | PUBLIC BUILDINGS SERVICE | SOCIAL SECURITY ADMINISTRATION | — | 238210Electrical Contractors and Other Wiring Installation Contractors | N063INSTALLATION OF EQUIPMENT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS | Nov 7, 2012 | Nov 7, 2012 | Mar 31, 2013 | ||
| THE CONTRACTOR IS RESPONSIBLE FOR THE ALL OF THE LABOR, MATERIALS, SUPERVISION, EQUIPMENT, AND SUPPLIES IN ORDER TO INSTALL 4 NEW SECURITY CAMERAS FOR SSA REDWOOD CITY. | MIE, INC. | $24,070 | PUBLIC BUILDINGS SERVICE | SOCIAL SECURITY ADMINISTRATION | — | 238210Electrical Contractors and Other Wiring Installation Contractors | N063INSTALLATION OF EQUIPMENT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS | Oct 18, 2012 | Oct 18, 2012 | Mar 31, 2013 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO PROVIDE AND INSTALL EIGHTY-TWO (82) MAGANARAY MODEL #W1PL36 WEATHERPROOF LIGHTING FIXTURES IN STAIRWELL; PROVIDE AND INSTALL EIGHTY-TWO (82) MAGNARAY WATTSTOPPER MODEL #EW-200-120-X IN THE STAIRWELL; PROVIDE AND INSTALL ALL CONDUIT, CABLE AND SUPPORTS AS REQUIRED; DEMOLISH EXISTING LIGHT FIXTURES IN THE STAIRWELL #1 AND #3. THE FIXTURES WILL BE DISPOSED OF AND LIGHT BULBS WILL BE SUBMITTED TO GSA RECYCLE PROGRAM. ALL WORK TO BE PERFORMED ON STRAIGHT TIME (M-F, 7:00-2:30). SEE ATTACHED SOW. | MIE, INC. | $149,995 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 238210Electrical Contractors and Other Wiring Installation Contractors | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Apr 18, 2012 | Apr 12, 2012 | Aug 31, 2012 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION TO: 1)INSTALL FIVE (5) POLES AND ASSOCIATED LIGHTING ARRAYS AIMED AT ALLEY (30' POLES MOUNTED WITH MAGNARAY W4PT5096 FIXTURES AT 848 WATTS, 277 VOLTS) 2)FURNISH AND INSTALL NECESSARY CONDUIT BETWEEN EACH POLE 3)PERFORM ALL NECESSARY TRENCHING AND REPLACEMENT OF SOIL IN PLANTER AREA. 4)IRRIGATION AND DRIP LINES WILL BE MOVED TO ACCOMMODATE NEW PIERS IN PLANTER AREA. 5)ANY DISTURBED LINES IN PLANTER AREA WILL BE REPAIRED OR REPLACED. 6)REMOVE ONE (1) CAMERA BY STAIRWELL #3 AND RE-INSTALL ON NEW LIGHT POLE. 7)DELIVER 2-277 20 AMP A/C DEDICATED CIRCUITS TO THE NORTH WEST CORNER OF THE BUILDING EXTERIOR. 8)ALL NECESSARY ELECTRICAL CONDUIT, WIRING AND JUNCTION BOXES. 9)TIE IN AND PROGRAM INTO THE LUTRON LIGHTING SYSTEM. 10)COORDINATED WITH SSA FOR WORK WITHIN THEIR SPACE. 11)O&M CONTRACTOR (ENOVITY) WILL PROVIDE "AS BUILTS" 12)LABEL CIRCUITS AND DOCUMENTATIONS/REVISIONS TO "AS BUILTS". | MIE, INC. | $145,000 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 238210Electrical Contractors and Other Wiring Installation Contractors | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jan 4, 2012 | Nov 30, 2011 | Nov 30, 2012 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO FURNISH AND INSTALL (6) PROPANE HEATERS FOR SKY GARDEN. | MIE, INC. | $4,000 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Dec 13, 2011 | Dec 13, 2011 | Jan 13, 2012 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION TO REPLACE TWO (2) SEWAGE EJECTORS LOCATED IN BASEMENT. | MIE, INC. | $54,986 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 237110Water and Sewer Line and Related Structures Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Nov 17, 2011 | Nov 16, 2011 | Mar 31, 2012 | ||
| UPPER GUADALUPE RIVER REACH 10B FINAL CHANNEL REASLIGNMENT FOR 2011-2012 | MIE, INC. | $1,753,624 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z212 | Sep 30, 2011 | Sep 30, 2011 | Oct 15, 2012 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION TO CLEAN GRANITE. | MIE, INC. | $75,302 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 561790Other Services to Buildings and Dwellings | Z111 | Sep 22, 2011 | Sep 22, 2011 | Dec 30, 2011 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION TO REMOVE EXISTING BRACKETS THAT SUPPORT CAMERAS AT EACH CORNER OF THE BUILDING, AND INSTALL NEW STAINLESS STEEL BRACKETS. | MIE, INC. | $17,485 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z111 | Sep 7, 2011 | Aug 24, 2011 | Dec 31, 2011 | ||
| THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS, SUPERVISION AND EQUIPMENT TO DO 1) MOBILIZATION, 2)FLASHING AT 2ND FLOOR WATER TABLE, 3) DRILL TWO (2) WEEP HOLES IN MORTAR JOINTS, 4) PAINTING AT NORTH ELEVATION, 5) REPLACE 5 PIECES OF GRANITE, 6) SEAL METAL TO METAL JOINTS AT EAST ELEVATION. | MIE, INC. | $152,658 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 238140Masonry Contractors | Z111 | Aug 26, 2011 | Aug 22, 2011 | Dec 22, 2011 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION TO CLEAN GRANITE AT CURVED EDGE WHERE SCUFFED BY SKATEBOARD TRAFFIC; CLEAN NORTH END OF WEST ELEVATION WHERE DIESEL EXHAUST STAINS HAVE OCCURED. | MIE, INC. | $15,777 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 561790Other Services to Buildings and Dwellings | Z111 | Aug 19, 2011 | Aug 16, 2011 | Dec 31, 2011 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION TO REFINISH WOOD DOOR, INSIDE AND OUT, INCLUDING DOOR FRAME. | MIE, INC. | $8,588 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 238320Painting and Wall Covering Contractors | Z111 | Aug 19, 2011 | Aug 16, 2011 | Dec 31, 2011 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION TO FURNSIH AND INSTALL ONE (1) 277 VOLT EXTERIOR LIGHT FIXTURE AND ONE (1) 277 VOLT OUTDOOR MOTION SENSOR AT BEGINNING OF ENTRANCEWAY AT ALLEY/STREET LEADING TO BACK DOOR OF 90 SEVENTH STREET. THE NEW FIXTURE AND MOTION SENSOR IS TO BE FED FROM EXISTING LIGHT FIXTURE ABOVE DOOR AT END OF ALLEY, APPROX. 30' AWAY. CONTRACTOR SHALL FURNISH AND INSTALL APPROX. 30' OF SURFACE MOUNTED CONDUIT, NECCESSARY CONDUCTORS AND WEATHERPROOF BACK BOXES. | MIE, INC. | $0 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 237310Highway, Street, and Bridge Construction | Z111 | Aug 9, 2011 | Aug 8, 2011 | Sep 30, 2011 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT AND SUPERVISION TO INSTALL NON-SLIP COATING IN THE EAST AND WEST EXTERIOR FIRE ESCAPE STAIRS. | MIE, INC. | $128,501 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 238320Painting and Wall Covering Contractors | Z111 | Aug 8, 2011 | Aug 5, 2011 | Sep 30, 2011 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT, AND SUPERVISION TO PROVIDE AND INSTALL THE ICVC BOARDS ON THE EXISTING TWO (2) CARRIER 19XRV CHILLERS AND TEST THE CHILLERS FOR PROPER OPERATION. | MIE, INC. | $85,600 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z111 | Aug 2, 2011 | Jul 29, 2011 | Nov 30, 2011 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT, AND SUPERVISION TO SCARIFY AND ROTA-TILL THE EXISTING DECOMPOSED GRANITE (DG) TO ENSURE THE NEW DG MATERIALS BLENDS AND COMPACTS PROPERLY; SET-UP PROPER ROAD BLOCK, SAFETY CONES, AND SIGNAGE DURING DELIVERY OF NEW DG TO THE SITE; TRANSFER TRUCKS WILL BE USED TO DROP OFF MATERIAL IN 25 TON INCREMENTS; CHECK AND MODIFY THE IRRIGATION TO THE TREES TO ENSURE PROPER WATERING; RAISE IRRIGATION VALVE BOXES, SEWER BOXES, AND ELECTRIC BOXES TO PROPER HEIGHT DURING THE DG INSTALLATION; RAISE 5 DRAIN CATCHES TO PROPER HEIGHT, AND THE CATCHES WILL BE LASER LEVELED TO ENSURE THE FALL IS NOT TOO STEEP TO CAUSE THE EROSION THAT IS OCCURING NOW; INSTALL 180 TONS OF NEW TAN COLORED DECOMPOSED GRANITE TO MATCH EXISTING; SPREAD DG EVENLY OVER THE ENTIRE SITE TO AN APPROXIMATE DEPTH OF 3 1/2"; PROVIDE A BOMAG ROLLER AND VIBRATING PLATES TO GRADE AND LEVEL THE DG TO PROPER HEIGHT AND SLOPE; REMOVE AND REPLACE 8 SYCAMORE TREES IN THE PLAZA AREA AND 5 SYCAMORE TREES ON THE SEVENTH STREET SIDE. | MIE, INC. | $148,500 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 561730Landscaping Services | S208HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING | Jul 22, 2011 | Jul 19, 2011 | Sep 30, 2011 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR MATERIALS, EQUIPMENT, AND SUPERVISION TO REPAIR SWISS PEARL PANELS ON THE FOLLOWING FLOORS: 2ND, 3RD, 11TH, 15TH, AND 18TH. | MIE, INC. | $3,500 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 238340Tile and Terrazzo Contractors | Z111 | Jun 27, 2011 | Jun 27, 2011 | Jul 27, 2011 | ||
| THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS, EQUIPMENT AND SUPERVISION TO REPAIR WATER DAMAGE WALLS IN THE CHILDCARE CENTER LOCATED AT THE NEW SAN FRANCISCO FEDERAL BUILIDING 90 7TH STREET, SAN FRANCISCO, CA | MIE, INC. | $6,500 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 238320Painting and Wall Covering Contractors | Z111 | Feb 28, 2011 | Feb 28, 2011 | Jul 29, 2011 | ||
| DEPARTMENT OF TRANSPORTATION CABINET WORK. | MIE, INC. | $9,300 | PUBLIC BUILDINGS SERVICE | TRANSPORTATION, DEPARTMENT OF | — | 561790Other Services to Buildings and Dwellings | 7125CABINETS, LOCKERS, BINS, AND SHELVING | Dec 7, 2010 | Dec 7, 2010 | Mar 11, 2011 | ||
| INSTALLATION OF CCTV CAMERAS AND SERVER FOR THE SOCIAL SECURITY ADMINISTRATION, DALY CITY, CA 94015 | MIE, INC. | $48,925 | PUBLIC BUILDINGS SERVICE | SOCIAL SECURITY ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Z111 | Oct 26, 2010 | Oct 18, 2010 | Dec 31, 2010 | ||
| INSTALLATION OF CCTV CAMERAS AND SERVER FOR SOCIAL SECURITY ADMINISTRATION, 800 SOUTH CLAREMONT, SAN MATEO, CA 94402. | MIE, INC. | $53,400 | PUBLIC BUILDINGS SERVICE | SOCIAL SECURITY ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Z111 | Oct 26, 2010 | Oct 29, 2010 | Dec 31, 2010 | ||
| INSTALLATION OF CCTV CAMERAS AND SERVER FOR THE SOCIAL SECURITY ADMINISTRATION, REDWOOD CITY, CA 94063 | MIE, INC. | $53,500 | PUBLIC BUILDINGS SERVICE | SOCIAL SECURITY ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Z111 | Oct 26, 2010 | Oct 19, 2010 | Dec 31, 2010 | ||
| INSTALLATION OF CCTV CAMERAS AND SERVER FOR SOCIAL SECURITY ADMINISTRATION, 95 7TH STREET, SAN FRANCISCO, CA 94103 | MIE, INC. | $38,375 | PUBLIC BUILDINGS SERVICE | SOCIAL SECURITY ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Z111 | Oct 25, 2010 | Oct 19, 2010 | Dec 31, 2010 | ||
| TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::4230::RP# SOLAR PANEL PROJECT, COYOTE VALLEY DAM/LAKE MENDOCINO. INSTALL AND TEST A SOLAR PANEL ARRAY THAT IS INSTALLED ON TWO BUILDINGS. ONE ARRAY WILL COMPLETELY COVER THE ROOF OF A NEW PREFAB STEEL BUILDING THAT IS CURRENTLY UNDER CONSTRUCTION AND THE REMAINING SOLAR PANELS WILL BE INSTALLED ON THE NEIGHBORING BUILDING # 3 | MIE, INC. | $728,168 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 238990All Other Specialty Trade Contractors | Y249 | Sep 29, 2010 | Sep 29, 2010 | May 16, 2011 | ||
| A STAGING AREA WILL BE DETERMINED BY MUTUAL AGREEMENT AFTER CONSTRUCTION CONTRACT AWARD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS, DEMOLITION, DISPOSAL, INSTALLATION AND SUPERVISION REQUIRED TO COMPLETE THE CORRECT INSTALLATION OF ALL ITEMS LISTED OR IMPLIED BY THIS SPEC. THE FOLLOWING INFORMATION IS PROVIDED FOR BIDDING PURPOSES ONLY. THE CONTRACTOR IS ADVISED TO CONDUCT A SITE VISIT AND FIELD-VERIFY EXACT SITE INFORMATION REQUIRED FOR USE IN COMPLETING THE WORK AND SUBMITTING BID. NO ASBESTOS CONTAINING MATERIALS SHALL BE USED. THE PERFORMANCE OF THIS WORK SHALL BE COMPLETED AFTER THE NORMAL WORKING HOURS (7:00 TO 5:00). SCHEDULING ARRANGEMENTS AND COORDINATE ALL WORK MUST BE MADE WITH JAIME STEPHAN, ASSISTANT PROPERTY MANAGER AT (415) 625-2754 OR (415) 652-9422. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING BUILDING PROPERTY SURFACES FROM DAMAGE DUE TO WORK PERFORMED UNDER THIS CONTRACT. DAMAGES TO EXISTING SURFACES CAUSED BY THE PERFORMANCE OF THIS CONTRACT SHALL BE REPAIRED AS TO MATCH THE EXISTING SURFACE FINISH. THE CONTRACTOR SHALL REMOVE ALL DEBRIS GENERATED IN THE PERFORMANCE OF THIS CONTRACT ON A DAILY BASIS. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT ANY DEBRIS FROM FILTERING INTO OTHER PARTS OF THE BUILDING INCLUDING BUT NOT LIMITED TO MECHANICAL SYSTEMS. NO EQUIPMENT OR SUPPLIES WILL BE FURNISHED BY GSA. AT THE COMPLETION OF THE PROJECT, THE PROJECT AREA SHALL BE CLEANED TO BUILDING STANDARDS AS DETERMINED BY THE ASSISTANT PROPERTY MANAGER. SHOULD THE CONTRACTOR FAIL TO CLEAN THE PROJECT LIMITS IN A TIMELY MANNER, GSA WILL CONTRACT FOR SAID CLEANING AND THE COST WILL BE DEDUCTED FROM THE CONTRACT. ALL APPLICABLE CODES SHALL BE ADHERED TO THE MAXIMUM EXTENT POSSIBLE. ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE APPLICABLE STANDARDS, GUIDELINES, AND CODES REQUIRED BY THE LOCAL, STATE AND FEDERAL AUTHORITIES. 9. SPECIAL NOTES. THE CO HAS THE RIGHT TO REJECT ANY UNSATISFACTORY OR UNSUITABLE MATERIAL OR WORKMANSHIP. ANY DAMAGE CAUSED BY THE CONTRACTOR TO GOVERNMENT PROPERTY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CORRECT IN A TIMELY MANNER. | MIE, INC. | $0 | Public Buildings Service | Public Buildings Service | — | 238330Flooring Contractors | 7220FLOOR COVERINGS | May 4, 2010 | May 4, 2010 | Aug 31, 2010 |