Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TO PERFORM MAINTENANCE DREDGING OF THE BOAT BASIN AND ENTRANCE CHANNEL AT U.S. COAST GUARD, STATION SHINNECOCK, HAMPTON BAYS, NY, PSN 24008351 IN THE AMOUNT OF $ 1,608,230.00. | CHESTERFIELD ASSOCIATES INC | $1,131,768 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z1KFMAINTENANCE OF DREDGING FACILITIES | Sep 22, 2025 | Sep 22, 2025 | Apr 17, 2026 | ||
| REPAIR WATERFRONT - USCG STATION MONTAUK (MONTAUK, NEW YORK) | CHESTERFIELD ASSOCIATES INC | $1,101,360 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | Mar 31, 2025 | Mar 31, 2025 | Apr 17, 2026 | ||
| CRANE RENTAL | CHESTERFIELD ASSOCIATES INC | $13,300 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 237990Other Heavy and Civil Engineering Construction | W017LEASE OR RENTAL OF EQUIPMENT- AIRCRAFT LAUNCHING, LANDING, AND GROUND HANDLING EQUIPMENT | Aug 10, 2021 | Aug 10, 2021 | Aug 19, 2021 | ||
| IGF::CT::IGF REMOVAL OF MISCELLANEOUS DEBRIS FROM 250 | CHESTERFIELD ASSOCIATES INC | $10,850 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 562119Other Waste Collection | S205HOUSEKEEPING- TRASH/GARBAGE COLLECTION | Sep 9, 2015 | Sep 9, 2015 | Oct 9, 2015 | ||
| IGF::OT::IGF PROJECT: NY ERFO FIIS 2013-1(6) THE PROJECT CONSISTS OF THE REPLACEMENT OF THE STORM DAMAGED LIGHTHOUSE DOCK WITHIN THE FIRE ISLAND NATIONAL SEASHORE. THE WORK INCLUDES THE REMOVAL OF THE EXISTING TIMBER STRUCTURE, INSTALLATION OF TREATED TIMBER PILES AND DOCK WALKWAY INCLUDING ELECTRICAL SYSTEMS, AND OTHER MISCELLANEOUS WORK. | CHESTERFIELD ASSOCIATES INC | $808,113 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Oct 21, 2014 | Oct 21, 2014 | Dec 28, 2015 | ||
| IGF::OT::IGF 3902219 HSANDY REPLACE SINGLE PILE AIDS ANT MORICHES, MORICHES, NY PROJECT 3902219 | CHESTERFIELD ASSOCIATES INC | $89,000 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z1BCMAINTENANCE OF RADAR AND NAVIGATIONAL FACILITIES | Dec 30, 2013 | Dec 30, 2013 | Mar 24, 2014 | ||
| IGF::OT::IGF PROJECT: NY ERFO FIIS 2013-1(2) THE PROJECT CONSISTS OF THE RECONSTRUCTION THE BOARDWALKS AT THE FIRE ISLAND LIGHTHOUSE AREA AND OTIS PIKE WILDERNESS AREA. THE WORK INCLUDES INSTALLATION OF WOODEN POSTS, DECKING, STRINGERS, TIMBER RAILING, AND OTHER MISCELLANEOUS WORK. | CHESTERFIELD ASSOCIATES INC | $2,048,531 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Sep 18, 2013 | Sep 18, 2013 | Apr 16, 2020 | ||
| IGF::OT::IGF THIS INVITATION FOR BIDS IS FOR THE SAGAMORE HILL NATIONAL HISTORIC SITE, PROJECT NO. PROJECT NY ERFO SAHI 2013-1(1), LOCATED IN NASSAU COUNTY, NEW YORK IN STRICT ACCORDANCE WITH THE SOLICITATION/CONTRACT INSTRUCTIONS, NOTICES, CLAUSES, PROVISIONS, ITEMS LISTED BELOW, AND FOR THE QUANTITIES OF WORK ACTUALLY PERFORMED AT THE UNIT PRICES AS BID IN THE BID SCHEDULE, INCLUDING ALL APPLICABLE FEDERAL, STATE, AND LOCAL TAXES. FP - STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS&BRIDGES ON FEDERAL HIGHWAY PROJECTS. BID SCHEDULE, SECTION B - PAGES B-1 THROUGH B-2. SPECIAL CONTRACT REQUIREMENTS, SECTION J - PAGES J-1 THROUGH J-18. PLANS, SHEETS 1 THROUGH 8. STATEMENT OF WORK, 1 PAGE. DAMAGE SURVEY REPORT, PAGES 1 THROUGH 5. PERMITS, PAGES 1 THROUGH 37. COE: JAMES GRAY | CHESTERFIELD ASSOCIATES INC | $198,500 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Jul 31, 2013 | Jul 31, 2013 | Jul 16, 2014 | ||
| CRANE RENTAL | CHESTERFIELD ASSOCIATES INC | $4,300 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 237990Other Heavy and Civil Engineering Construction | W038LEASE OR RENTAL OF EQUIPMENT- CONSTRUCTION, MINING, EXCAVATING, AND HIGHWAY MAINTENANCE EQUIPMENT | May 29, 2013 | May 29, 2013 | May 31, 2013 | ||
| SOUTHPORT LIGHT 7 CASREP REPAIRS FOR CGC BOLLARD | CHESTERFIELD ASSOCIATES INC | $67,100 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z1PZMAINTENANCE OF OTHER NON-BUILDING FACILITIES | Mar 21, 2012 | Sep 17, 2012 | Dec 1, 2012 | ||
| PURCHASE ORDER WILL BE REQUIRED COMPANY DOES NOT TAKE CREDIT CARD, DUNS # 0577285370000. SERVICE TO BE PROVIDED AT 638C STEWART AVE M&R SHOP. | CHESTERFIELD ASSOCIATES INC | $750 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | 5450MISCELLANEOUS PREFABRICATED STRUCTURES | Sep 12, 2011 | Sep 12, 2011 | Oct 12, 2011 | ||
| REPLACE SHACKLE CONCRETE FLOATING DOCK. RECOAT 10 FLOATING DOCK PILES | CHESTERFIELD ASSOCIATES INC | $186,425 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Jun 9, 2011 | Jun 9, 2011 | Sep 17, 2011 | ||
| 01P05050 - WATERFRONT REPAIRS AT CG STATION NEW YORK, STATEN ISLAND, NEW YORK, PROJECT NUMBER 01-P05050 | CHESTERFIELD ASSOCIATES INC | $148,296 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Jun 2, 2011 | Jun 2, 2011 | Oct 31, 2011 | ||
| STA NEW YORK PROVIDE FOR UPGRADE OF 4 SHORE TIE CONNECTIONS FROM 50 AMP TO 100 AMP TO SUPPORT NEW 45-FT RBM-PRO VESSELS. | CHESTERFIELD ASSOCIATES INC | $20,674 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Jan 7, 2011 | Jan 7, 2011 | Jul 29, 2011 | ||
| INSTALL NEW RETAINING WALL ALONG ACCESS DRIVE AT CG STA JONES BEACH, FREEPORT, NY PROJECT 3173187 | CHESTERFIELD ASSOCIATES INC | $336,116 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Nov 9, 2010 | Nov 9, 2010 | Mar 11, 2011 | ||
| SHORE TIE CONNECTIONS REQUIRE UPGRADE FROM 50 AMPS TO 100 AMPS TO SUPPORT NEW 45-FT RBM-PRO VESSELS. STA NY | CHESTERFIELD ASSOCIATES INC | $255,997 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Sep 16, 2010 | Sep 16, 2010 | Nov 3, 2011 | ||
| REPAIR SADDLEBACK LEDGE LIGHT, ISLE AU HAUT BAY, ME (KNOX COUNTY). | CHESTERFIELD ASSOCIATES INC | $187,987 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Jun 22, 2010 | Jun 22, 2010 | Jun 24, 2013 | ||
| BUOY RECOVERY - CHESTERFIELD ASSOCIATES | CHESTERFIELD ASSOCIATES INC | $21,000 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | V125TRANSPORTATION/TRAVEL/RELOCATION- TRANSPORTATION: VESSEL TOWING | Jun 1, 2010 | Jun 2, 2010 | Jul 1, 2010 | ||
| THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION, TRANSPORTATION AND DISPOSAL NECESSARY TO DREDGE BOAT BASIN (APPROX 1100 CY) AT USCG STA MERRIMACK RIVER IN NEWBURYPORT, MA IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWING FOR PSN 01-P5515, PREVIOUSLY PROVIDED. | CHESTERFIELD ASSOCIATES INC | $0 | US COAST GUARD | — | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Aug 12, 2009 | Aug 12, 2009 | Oct 8, 2010 | ||
| WATERFRONT ALTERATIONS AT CG STA JONES BEACH, PROJECT 409556 | CHESTERFIELD ASSOCIATES INC | $748,334 | US COAST GUARD | — | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Sep 10, 2008 | Sep 10, 2008 | Apr 20, 2009 | ||
| FURNISH LABOR AND EQUIPMENT TO RELOCATE | CHESTERFIELD ASSOCIATES INC | $4,950 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 237990Other Heavy and Civil Engineering Construction | F021NATURAL RESOURCES/CONSERVATION- SITE PREPARATION | Jul 31, 2008 | Jul 31, 2008 | Aug 29, 2008 | ||
| INSTALL FENCE AND CONCRETE SLAB | CHESTERFIELD ASSOCIATES INC | $54,000 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 238990All Other Specialty Trade Contractors | X299 | Jul 14, 2008 | Jul 14, 2008 | Sep 12, 2008 | ||
| LABOR TO INSTALL 3 CLASS B PILES | CHESTERFIELD ASSOCIATES INC | $3,775 | DEPT OF THE ARMY | DEFENSE FINANCE AND ACCOUNTING SERVICE (DFAS) | — | 237990Other Heavy and Civil Engineering Construction | 2990MISCELLANEOUS ENGINE ACCESSORIES, NONAIRCRAFT | May 21, 2008 | May 21, 2008 | May 21, 2008 | ||
| REPLACEMENT OF FIVE ATONS IN THE NY STATE CHANNEL | CHESTERFIELD ASSOCIATES INC | $27,500 | US COAST GUARD | — | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Sep 18, 2007 | Sep 18, 2007 | Oct 19, 2007 | ||
| REPLACE TIMBER BULKHEAD AT CG STA EATONS NECK, NORTHPORT, NY, PROJECT 01P05082. | CHESTERFIELD ASSOCIATES INC | $499,388 | US COAST GUARD | US COAST GUARD | — | 237990Other Heavy and Civil Engineering Construction | Z299 | Aug 10, 2007 | Aug 10, 2007 | Sep 30, 2008 |