Name | Type | Posted | Actions |
|---|---|---|---|
W9124C20R0007_0002_20200902.pdf | Sep 2, 2020 | ||
Attachment XI - 2100 extract from Dawson 2015 4-26-16_20200901.pdf | Sep 1, 2020 | ||
Attachment X - Building 2100 Limited Asbestos Report 4-1-15_20200901.pdf | Sep 1, 2020 | ||
RFI_W9124C20R0007_20200901_Final.pdf | Sep 1, 2020 | ||
Attachment IX - 2100 Asbestos Report 4-6-12_20200901.pdf | Sep 1, 2020 | ||
Attachment V_PRS_20200901.pdf | Sep 1, 2020 | ||
W9124C20R0007_0001_20200901.pdf | Sep 1, 2020 | ||
20R0007_IMCOM DPW MATOC Site Visit Attendees_20200811.pdf | Aug 12, 2020 | ||
Attachment IV - Bldg 2100 drawings specs_p1-62_20200806.pdf | Aug 6, 2020 | ||
Attachment IV - Bldg 2100 drawings specs_p63-125_20200806.pdf | Aug 6, 2020 | ||
Attachment IV - Bldg 2100 drawings specs_p126 -186_20200806.pdf | Aug 6, 2020 | ||
W9124C20R20007_FINAL.docx | DOCX | Jul 29, 2020 | |
Attachment V - PRS 20200721.doc | DOC | Jul 29, 2020 | |
Attachment II - Wage Determinations Residential Building Heavy 02032020.pdf | Jul 29, 2020 | ||
Attachment VII - Performance Assessment Questionnaire w-Cover Letter 20200729.pdf | Jul 29, 2020 | ||
Attachment III - SOW Sample Project Bldg 2100_21 Jul 20.docx | DOCX | Jul 29, 2020 | |
Attachment VI - Reference Overview Sheet.xlsx | XLSX | Jul 29, 2020 | |
Attachment I - Statement of Work_7 Apr 20 Final.doc | DOC | Jul 29, 2020 | |
Attachment VIII_BUILDING_2100_Specifications.pdf | Jul 29, 2020 | ||
Attachment II - Wage Determinations (Residential_Building and Heavy)02032020.pdf | Feb 10, 2020 | ||
Attachment VII - Performance Assessment Questionnaire.docx | DOCX | Feb 10, 2020 | |
Attachment VI - Reference Overview Sheet.xlsx | XLSX | Feb 10, 2020 | |
Attachment V - PRS.doc | DOC | Feb 10, 2020 | |
Attachment IV - Bldg 3330 As-Builts.pdf | Feb 10, 2020 | ||
Attachment III - SOW Sample Project Bldg. 5385 (Draft).docx | DOCX | Feb 10, 2020 |
IMCOM_DPW_MATOC
IMCOM_DPW_MATOC
Contact and place of performance
Regina N. Givens
Columbia, SC 29207
USA
20200902 - The purpose of this update is to post Amendment 0001 to the Solicitation W9124C-20-R-0007. The Amendment removes a statement added to M.3.1 Factor 1/Subfactor 1: Construction Experience, erroneously added in Amendment 0001. As a result of this Amendment, the Solicitation will not be extended. All other terms and conditions remain the same. 20200901 - The purpose of this update is to post Amendment 0001 to...
View moreThe Department of the Army, Mission and Installation Contracting Command (MICC) at Fort Jackson, has issued solicitation W9124C20R0007 to procure a broad range of real property repair and construction services for the IMCOM Directorate of Public Works (DPW) Engineering Division. This requirement is being competed as a HUBZone Small Business Set-aside under NAICS code 236220, Commercial and Institutional Building Construction, and PSC Z2QA, Repair or Alteration of Restoration of Real Property (Public or Private). The government intends to award a Firm Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with a performance period starting September 28, 2020, through September 27, 2025, consisting of a one-year base period and four one-year option periods.
The scope of work includes facility repairs, renovations, and construction located in Columbia, South Carolina. Potential projects involve administrative facilities, child development centers, physical fitness centers, maintenance shops, food service facilities, airfield structures, roads, and utilities. Work may include incidental design, testing, studies, surveys, and abatement for lead-based paint or asbestos-containing materials. Some projects may require development from conceptual ideas.
The response deadline for this solicitation is September 24, 2020. Contracting Officer Regina N. Givens is the primary point of contact for this requirement. Documentation associated with this notice includes 25 attachments, such as the solicitation, RFI responses, an updated Performance Requirements Summary, site visit sign-in sheets, and various asbestos and technical reports for Building 2100. Recent amendments have addressed construction experience factors and finalized technical attachments without extending the original submission deadline.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.