Name | Type | Posted | Actions |
|---|---|---|---|
W9124C20R0007_0002_20200902.pdf | Sep 2, 2020 | ||
Attachment XI - 2100 extract from Dawson 2015 4-26-16_20200901.pdf | Sep 1, 2020 | ||
Attachment X - Building 2100 Limited Asbestos Report 4-1-15_20200901.pdf | Sep 1, 2020 | ||
RFI_W9124C20R0007_20200901_Final.pdf | Sep 1, 2020 | ||
Attachment IX - 2100 Asbestos Report 4-6-12_20200901.pdf | Sep 1, 2020 | ||
Attachment V_PRS_20200901.pdf | Sep 1, 2020 | ||
W9124C20R0007_0001_20200901.pdf | Sep 1, 2020 | ||
20R0007_IMCOM DPW MATOC Site Visit Attendees_20200811.pdf | Aug 12, 2020 | ||
Attachment IV - Bldg 2100 drawings specs_p1-62_20200806.pdf | Aug 6, 2020 | ||
Attachment IV - Bldg 2100 drawings specs_p63-125_20200806.pdf | Aug 6, 2020 | ||
Attachment IV - Bldg 2100 drawings specs_p126 -186_20200806.pdf | Aug 6, 2020 | ||
W9124C20R20007_FINAL.docx | DOCX | Jul 29, 2020 | |
Attachment V - PRS 20200721.doc | DOC | Jul 29, 2020 | |
Attachment II - Wage Determinations Residential Building Heavy 02032020.pdf | Jul 29, 2020 | ||
Attachment VII - Performance Assessment Questionnaire w-Cover Letter 20200729.pdf | Jul 29, 2020 | ||
Attachment III - SOW Sample Project Bldg 2100_21 Jul 20.docx | DOCX | Jul 29, 2020 | |
Attachment VI - Reference Overview Sheet.xlsx | XLSX | Jul 29, 2020 | |
Attachment I - Statement of Work_7 Apr 20 Final.doc | DOC | Jul 29, 2020 | |
Attachment VIII_BUILDING_2100_Specifications.pdf | Jul 29, 2020 | ||
Attachment II - Wage Determinations (Residential_Building and Heavy)02032020.pdf | Feb 10, 2020 | ||
Attachment VII - Performance Assessment Questionnaire.docx | DOCX | Feb 10, 2020 | |
Attachment VI - Reference Overview Sheet.xlsx | XLSX | Feb 10, 2020 | |
Attachment V - PRS.doc | DOC | Feb 10, 2020 | |
Attachment IV - Bldg 3330 As-Builts.pdf | Feb 10, 2020 | ||
Attachment III - SOW Sample Project Bldg. 5385 (Draft).docx | DOCX | Feb 10, 2020 |
IMCOM_DPW_MATOC
Contact and place of performance
Regina N. Givens
Columbia, SC 29207
USA
20200902 - The purpose of this update is to post Amendment 0001 to the Solicitation W9124C-20-R-0007. The Amendment removes a statement added to M.3.1 Factor 1/Subfactor 1: Construction Experience, erroneously added in Amendment 0001. As a result of this Amendment, the Solicitation will not be extended. All other terms and conditions remain the same. 20200901 - The purpose of this update is to post Amendment 0001 to...
View moreThe Department of the Army, Mission and Installation Contracting Command (MICC) at Fort Jackson, requires a broad range of real property repair and construction services for the IMCOM Directorate of Public Works Engineering Division. This procurement is classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Z2QA, Repair or Alteration of Restoration of Real Property (Public or Private). The project is designated as a HUBZone Small Business Set-aside (HZC). Services include the repair, renovation, and construction of administrative facilities, maintenance shops, child development centers, food service facilities, airfield structures, and various utility systems. Scope may also involve incidental design, testing, studies, surveys, and abatement for lead-based paint or asbestos.
The government intends to award a Firm-Fixed-Price Indefinite Delivery Indefinite Quantity Multiple Award Task Order Contract. The anticipated performance period runs from September 28, 2020, to September 27, 2025, consisting of a one-year base period and four optional one-year periods. Work will be performed in Columbia, South Carolina. Recent updates to solicitation W9124C20R0007 provided RFI responses, site visit sign-in sheets, and technical attachments regarding asbestos reports and performance requirements.
The response deadline for this opportunity is September 24, 2020. Regina N. Givens serves as the primary point of contact for the MICC-Fort Jackson contracting office. Documentation associated with this notice includes 25 attachments, such as the formal solicitation, technical extracts, and multiple amendments addressing construction experience factors and project-specific reports.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.