Name | Type | Posted | Actions |
|---|---|---|---|
MACC_Section_L_0003.pdf | May 1, 2019 | ||
Solicitation_Amendment_FA481419RA0010003_SF_30.pdf | May 1, 2019 | ||
Q&A_Clarification.pdf | May 1, 2019 | ||
MACC_Section_M_0003.pdf | May 1, 2019 | ||
QA2_-_MASTER.pdf | Apr 15, 2019 | ||
Solicitation_Amendment_FA481419RA0010002_SF_30.pdf | Apr 15, 2019 | ||
APPENDICES_1_-_17_FA481419RA001.zip | ZIP | Apr 2, 2019 | |
Solicitation_Amendment_1.pdf | Apr 2, 2019 | ||
MACC_Section_L.pdf | Apr 2, 2019 | ||
Q&A.pdf | Apr 2, 2019 | ||
RFP_Attachment_1_SOW.pdf | Apr 2, 2019 | ||
Site_Visit_Briefing_Slides_V2.ppt | PPT | Mar 21, 2019 | |
Sign_in_sheet.pdf | Mar 21, 2019 | ||
16-0123(Seed).zip | ZIP | Mar 20, 2019 | |
SEED_SOW_App_K_Design_Req.pdf | Mar 11, 2019 | ||
RFP_Attachment_7_NAF_Construction_Clauses.docx | DOCX | Mar 11, 2019 | |
Attachment_3_Performance_Reference.docx | DOCX | Mar 11, 2019 | |
RFP_Attachment_6_Background_Check.xlsx | XLSX | Mar 11, 2019 | |
Attachment_5_Wage_Determinations.pdf | Mar 11, 2019 | ||
Attachment_4_Performance_Survey.doc | DOC | Mar 11, 2019 | |
MAP.jpg | JPG | Mar 7, 2019 | |
RFP_Attachment_1_SOW.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Mar 6, 2019 | ||
ppi_tool.accdb | ACCDB | Mar 6, 2019 | |
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf | Mar 6, 2019 | ||
SOW_Appendix_2_MacDill_AFB_Traffic_Control_Standards.pdf | Mar 6, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Mar 6, 2019 | ||
SOW_Appendix_5_SOP_4_Investigation_Derived_Waste.pdf | Mar 6, 2019 | ||
Interior_Design_Guide_(AMC.pdf | Mar 6, 2019 | ||
SOW_Appendix_6_SOP_6_Well_Install_Abn.pdf | Mar 6, 2019 | ||
SOW_Appendix_7_List_of_ERP_Sites.pdf | Mar 6, 2019 | ||
SOW_Appendix_8_Antiterrorism_Level_I_Training_Aid.pdf | Mar 6, 2019 | ||
SOW_Appendix_9_Contractor_Security.pdf | Mar 6, 2019 | ||
SEED_SOW_16-0123.pdf | Mar 6, 2019 | ||
SEED_SOW_App_B_16-0123_BLANK_3052.xlsx | XLSX | Mar 6, 2019 | |
SEED_SOW_App_C_16-0123_AF66.xls | XLS | Mar 6, 2019 | |
Solicitation_-_FA481419RA001_(2).pdf | Mar 6, 2019 | ||
2018_MacDill_Design_Guide.pdf | Mar 6, 2019 | ||
MACC_Section_M_V3.pdf | Mar 6, 2019 | ||
MACC_Section_L_V3.pdf | Mar 6, 2019 | ||
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf | Mar 6, 2019 | ||
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf | Mar 6, 2019 | ||
SOW_Appendix_3_Landscape_and_Design_Procedures.pdf | Mar 6, 2019 | ||
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf | Mar 6, 2019 | ||
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf | Mar 6, 2019 | ||
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Mar 6, 2019 | ||
SEED_SOW_App_J_As_Builts.pdf | Mar 6, 2019 | ||
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf | Mar 6, 2019 | ||
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf | Mar 6, 2019 | ||
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf | Mar 6, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Mar 6, 2019 | ||
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
Solicitation_-_FA481419RA001.pdf | Feb 4, 2019 | ||
RFP_Attachment_1_SOW.pdf | Feb 4, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Feb 4, 2019 | ||
SEED_SOW_16-0123.pdf | Feb 4, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
MACC_Section_M_V3.pdf | Feb 4, 2019 | ||
MACC_Section_L_V3.pdf | Feb 4, 2019 |
Multiple Award Construction Contract
Multiple Award Construction Contract
Contact and place of performance
Patrick Boyette
MacDill AFB, FL 33621
USA
The purpose of this amendment is to incorporate clarifications to Q&A received from industry and to remove certain page limitations from the seed project technical factor submission and remove the requirement for cut sheets. Please see Amendment 3 and the attached updated sections L & M as well as the Clarification for more information.
The Department of the Air Force, specifically the FA4814 6 CONS PK office, is soliciting proposals for a Multiple Award Construction Contract (MACC) to be performed at MacDill Air Force Base in Florida. This requirement falls under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Z. The solicitation is designated as an SBA set-aside. Interested parties must submit their responses by the deadline of May 7, 2019.
The scope of this solicitation involves general construction services, with recent administrative updates focusing on technical factor submissions for a seed project. These updates include clarifications derived from industry inquiries, the removal of specific page limitations for the seed project technical factor, and the elimination of the requirement for cut sheets. Detailed instructions and evaluation criteria are maintained in the 62 associated attachments, which include multiple solicitation amendments, updated sections L and M, and comprehensive question-and-answer documentation.
Contracting officer Patrick Boyette serves as the primary point of contact for this solicitation, identified by number FA481419RA001. Performance is centralized at MacDill Air Force Base, and all administrative updates, including Amendment 3, were finalized as of the last update on May 1, 2019.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.