Name | Type | Posted | Actions |
|---|---|---|---|
MACC_Section_L_0003.pdf | May 1, 2019 | ||
Solicitation_Amendment_FA481419RA0010003_SF_30.pdf | May 1, 2019 | ||
Q&A_Clarification.pdf | May 1, 2019 | ||
MACC_Section_M_0003.pdf | May 1, 2019 | ||
QA2_-_MASTER.pdf | Apr 15, 2019 | ||
Solicitation_Amendment_FA481419RA0010002_SF_30.pdf | Apr 15, 2019 | ||
APPENDICES_1_-_17_FA481419RA001.zip | ZIP | Apr 2, 2019 | |
Solicitation_Amendment_1.pdf | Apr 2, 2019 | ||
MACC_Section_L.pdf | Apr 2, 2019 | ||
Q&A.pdf | Apr 2, 2019 | ||
RFP_Attachment_1_SOW.pdf | Apr 2, 2019 | ||
Site_Visit_Briefing_Slides_V2.ppt | PPT | Mar 21, 2019 | |
Sign_in_sheet.pdf | Mar 21, 2019 | ||
16-0123(Seed).zip | ZIP | Mar 20, 2019 | |
SEED_SOW_App_K_Design_Req.pdf | Mar 11, 2019 | ||
RFP_Attachment_7_NAF_Construction_Clauses.docx | DOCX | Mar 11, 2019 | |
Attachment_3_Performance_Reference.docx | DOCX | Mar 11, 2019 | |
RFP_Attachment_6_Background_Check.xlsx | XLSX | Mar 11, 2019 | |
Attachment_5_Wage_Determinations.pdf | Mar 11, 2019 | ||
Attachment_4_Performance_Survey.doc | DOC | Mar 11, 2019 | |
MAP.jpg | JPG | Mar 7, 2019 | |
RFP_Attachment_1_SOW.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Mar 6, 2019 | ||
ppi_tool.accdb | ACCDB | Mar 6, 2019 | |
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf | Mar 6, 2019 | ||
SOW_Appendix_2_MacDill_AFB_Traffic_Control_Standards.pdf | Mar 6, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Mar 6, 2019 | ||
SOW_Appendix_5_SOP_4_Investigation_Derived_Waste.pdf | Mar 6, 2019 | ||
Interior_Design_Guide_(AMC.pdf | Mar 6, 2019 | ||
SOW_Appendix_6_SOP_6_Well_Install_Abn.pdf | Mar 6, 2019 | ||
SOW_Appendix_7_List_of_ERP_Sites.pdf | Mar 6, 2019 | ||
SOW_Appendix_8_Antiterrorism_Level_I_Training_Aid.pdf | Mar 6, 2019 | ||
SOW_Appendix_9_Contractor_Security.pdf | Mar 6, 2019 | ||
SEED_SOW_16-0123.pdf | Mar 6, 2019 | ||
SEED_SOW_App_B_16-0123_BLANK_3052.xlsx | XLSX | Mar 6, 2019 | |
SEED_SOW_App_C_16-0123_AF66.xls | XLS | Mar 6, 2019 | |
Solicitation_-_FA481419RA001_(2).pdf | Mar 6, 2019 | ||
2018_MacDill_Design_Guide.pdf | Mar 6, 2019 | ||
MACC_Section_M_V3.pdf | Mar 6, 2019 | ||
MACC_Section_L_V3.pdf | Mar 6, 2019 | ||
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf | Mar 6, 2019 | ||
SEED_SOW_App_D_16-0123_FGUA_Fee_Inspection_Memo.pdf | Mar 6, 2019 | ||
SOW_Appendix_3_Landscape_and_Design_Procedures.pdf | Mar 6, 2019 | ||
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf | Mar 6, 2019 | ||
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf | Mar 6, 2019 | ||
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Mar 6, 2019 | ||
SEED_SOW_App_J_As_Builts.pdf | Mar 6, 2019 | ||
SEED_SOW_App_I_16-0123_Asbestos_Notif_FM.pdf | Mar 6, 2019 | ||
SEED_SOW_App_H_16-0123_CD_Disp_Form.pdf | Mar 6, 2019 | ||
SEED_SOW_App_G_MAFB_Grn_Procur_Determ_Fm.pdf | Mar 6, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Mar 6, 2019 | ||
SEED_SOW_App_E_Haz_Matls_Fm_Instruc.pdf | Mar 6, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
Solicitation_-_FA481419RA001.pdf | Feb 4, 2019 | ||
RFP_Attachment_1_SOW.pdf | Feb 4, 2019 | ||
SEED_SOW_App_F_16-0123_Min_Perf_Stan.pdf | Feb 4, 2019 | ||
SEED_SOW_16-0123.pdf | Feb 4, 2019 | ||
SEED_SOW_App_A_16-0123_Drawings.pdf | Feb 4, 2019 | ||
MACC_Section_M_V3.pdf | Feb 4, 2019 | ||
MACC_Section_L_V3.pdf | Feb 4, 2019 |
Multiple Award Construction Contract
Multiple Award Construction Contract
Contact and place of performance
Patrick Boyette
MacDill AFB, FL 33621
USA
The purpose of this amendment is to incorporate clarifications to Q&A received from industry and to remove certain page limitations from the seed project technical factor submission and remove the requirement for cut sheets. Please see Amendment 3 and the attached updated sections L & M as well as the Clarification for more information.
The Department of the Air Force, specifically the FA4814 6 CONS PK office, is soliciting proposals for a Multiple Award Construction Contract (MACC) at MacDill Air Force Base, Florida. This acquisition is categorized under NAICS 236220, Commercial and Institutional Building Construction, and PSC Z. The solicitation is designated as an SBA set-aside. Interested parties must submit their responses by the deadline of May 7, 2019.
The primary purpose of the current notice update is to incorporate industry clarifications and amend proposal submission requirements. These changes include the removal of specific page limitations for the seed project technical factor submission and the elimination of the requirement for cut sheets. The solicitation, identified as FA481419RA001, includes 62 total attachments such as updated sections L and M, Q&A clarification documents, and various solicitation amendments. Patrick Boyette serves as the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.