Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 5 Questions from Industry REV 1.pdf | May 7, 2026 | ||
1232SA26Q0470 Amend 3.pdf | May 7, 2026 | ||
1232SA26Q0470 Amend 2.pdf | May 7, 2026 | ||
Attachment 5 Questions from Industry.pdf | May 7, 2026 | ||
1232SA26Q0470 Amend 1.pdf | Apr 22, 2026 | ||
Attachment 4 Drawings.pdf | Apr 20, 2026 | ||
SF 1442 1232SA26Q0470.pdf | Apr 20, 2026 | ||
Attachment 1 Statement of Work.docx | DOCX | Apr 20, 2026 | |
Attachment 3 WD IA20250003 Mod 0 Dated 2 Jan 2026.pdf | Apr 20, 2026 | ||
Attachment 2 Specifications.docx | DOCX | Apr 20, 2026 | |
SF 1442 1232SA26Q0470.pdf | Apr 20, 2026 |
Pumped Pretreated Waste System Vault Upgrade Project – Ames, IA
Pumped Pretreated Waste System Vault Upgrade Project – Ames, IA
Contact and place of performance
David Hildebrand
Ames, IA 50010
USA
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1232SA26Q0470 is issued as a Request for Quotation (RFQ) for The work includes replacing all the carbon steel piping componen...
View moreQuestions shall be submitted via emailed to [email protected] and are due no later than April 30, 2026 at 12:00 PM Central time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.
The Agricultural Research Service is issuing a combined synopsis and solicitation under solicitation number 1232SA26Q0470 for the Pumped Pretreated Waste System Vault Upgrade Project in Ames, Iowa. The project requires replacing all carbon steel piping components within vaults 101B, 103, and 105 with stainless steel components at the USDA Campus located at 1920 Dayton Avenue. Contractors must also replace all existing valves with new stainless steel, full-port ball valves and insulate all piping within the specified vaults. This acquisition is classified under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Z2ND REPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES.
This procurement is designated as a total small business set-aside using the SBA (SBA) category. Quotations are due by May 12, 2026, and questions regarding the request for quotation must be submitted to David Hildebrand by April 30, 2026. While Vault 105 is available for scheduled site visits through Brandon Keith, Vaults 101B and 103 will only be accessible after the contract award due to decontamination requirements. The solicitation is supported by 11 attachments, which include technical drawings, three project amendments, and a revised log of questions from industry.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.