Name | Type | Posted | Actions |
|---|---|---|---|
Q and A.pdf | May 7, 2026 | ||
1240LT26Q0046 A0001.pdf | Apr 28, 2026 | ||
Attchment 3 Comanche_Specifications v2.pdf | Apr 28, 2026 | ||
Comanche Site Visit.pdf | Apr 28, 2026 | ||
Q and A.pdf | Apr 28, 2026 | ||
Attachment 5 Wage Determination.pdf | Apr 10, 2026 | ||
Attachment 4 Maps and Drawaings.pdf | Apr 10, 2026 | ||
Attachment 1 SOI.pdf | Apr 10, 2026 | ||
1240LT26Q0046.pdf | Apr 10, 2026 | ||
Attachment 2 SOW.pdf | Apr 10, 2026 | ||
Attachment 3_Comanche_Specifications.pdf | Apr 10, 2026 |
Comanche Park Campground Reconstruction
Comanche Park Campground Reconstruction
Contact and place of performance
Erick Plamann
Custer, SD 57730
USA
POC Erick Plamann, Contract Specialist, [email protected] Comanche Park Campground Reconstruction The contractor will provide all labor, materials, and equipment for the campground improvement of 20 sites to 34 sites to include a road modification with curve widening and shaping for drainage and new surfacing. The Host Site and Volunteer Site will be relocated and upgraded with power, water and wa...
View moreQuestions and Answers updated
The Forest Service has issued this combined synopsis/solicitation for the reconstruction of the Comanche Park Campground located in Custer, South Dakota. The project scope involves expanding the campground from 20 to 34 sites, which includes road modifications featuring curve widening, shaping for drainage, and new surfacing. The contractor will relocate and upgrade the Host and Volunteer sites with power, water, and wastewater vaults. Additionally, four new pre-cast vault toilets will be installed to replace five original structures dating from 1965. The magnitude of this construction project is estimated between $1,000,000 and $5,000,000.
Water system improvements for this requirement consist of decommissioning the existing pumphouse and installing a new pre-cast concrete treatment building with upgraded plumbing and controls. Work also includes removing an existing aboveground water storage tank, installing a new below-ground fiberglass water storage tank, and replacing all distribution piping and hydrants in accordance with the specifications. This requirement is categorized under NAICS 237110 for Water and Sewer Line and Related Structures Construction and PSC Y1NE for Construction of Water Supply Facilities.
This procurement is designated as an SBA set-aside. Interested parties must submit their responses by May 11, 2026. The solicitation, identified as 1240LT26Q0046, includes 11 attachments such as wage determinations, site visit information, and updated questions and answers. Erick Plamann is the designated Contract Specialist for this effort. An organized site visit was scheduled for April 17, 2026, at the campground facility.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.