Name | Type | Posted | Actions |
|---|---|---|---|
Q and A.pdf | May 7, 2026 | ||
1240LT26Q0046 A0001.pdf | Apr 28, 2026 | ||
Attchment 3 Comanche_Specifications v2.pdf | Apr 28, 2026 | ||
Comanche Site Visit.pdf | Apr 28, 2026 | ||
Q and A.pdf | Apr 28, 2026 | ||
Attachment 5 Wage Determination.pdf | Apr 10, 2026 | ||
Attachment 4 Maps and Drawaings.pdf | Apr 10, 2026 | ||
Attachment 1 SOI.pdf | Apr 10, 2026 | ||
1240LT26Q0046.pdf | Apr 10, 2026 | ||
Attachment 2 SOW.pdf | Apr 10, 2026 | ||
Attachment 3_Comanche_Specifications.pdf | Apr 10, 2026 |
Comanche Park Campground Reconstruction
Comanche Park Campground Reconstruction
Contact and place of performance
Erick Plamann
Custer, SD 57730
USA
POC Erick Plamann, Contract Specialist, [email protected] Comanche Park Campground Reconstruction The contractor will provide all labor, materials, and equipment for the campground improvement of 20 sites to 34 sites to include a road modification with curve widening and shaping for drainage and new surfacing. The Host Site and Volunteer Site will be relocated and upgraded with power, water and wa...
View moreQuestions and Answers updated
The Forest Service has issued this combined synopsis and solicitation under identifier 1240LT26Q0046 for the Comanche Park Campground Reconstruction in Custer, South Dakota. This project involves expanding the campground from 20 to 34 sites, which includes road modifications for curve widening, drainage shaping, and new surfacing. The selected contractor will provide all labor, materials, and equipment to relocate and upgrade host and volunteer sites with power, water, and wastewater vaults. Additionally, four new pre-cast vault toilets will be installed to replace five existing structures originally built in 1965.
Water system improvements within the scope of work involve decommissioning the current pumphouse and installing a new pre-cast concrete treatment building with upgraded plumbing and controls. The project further requires the removal of an existing above-ground water storage tank, the installation of a new below-ground fiberglass storage tank, and the replacement of all distribution piping and hydrants. The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.
This requirement is set aside for the Small Business Administration (SBA) under NAICS code 237110, Water and Sewer Line and Related Structures Construction, and PSC Y1NE, Construction of Water Supply Facilities. Responses are due by May 11, 2026, following an organized site visit held on April 17, 2026. The contract specialist for this solicitation is Erick Plamann, and the associated documentation includes 11 attachments such as wage determinations, specifications, and multiple question-and-answer updates.