Name | Type | Posted | Actions |
|---|---|---|---|
Site Visit Sign In.pdf | Jul 31, 2023 | ||
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jul 13, 2023 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jul 13, 2023 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=FA462623R0011 | LINK | Jul 13, 2023 | |
https://dodprocurementtoolbox.com/ | LINK | Jul 13, 2023 |
LF Drainage and Driving Surfaces
The Department of the Air Force, specifically the 341 CONS LGC, is soliciting services for the restoration of drainage and driving surfaces at various Launch Facilities. The scope of work includes restoring site elevations around support buildings and driving surfaces, cleaning existing culverts, and installing new culverts. Contractors will also be responsible for importing and placing aggregate base course, as well as reshaping ditches and driving surfaces to ensure the proper drainage of surface water from each site.
This requirement is identified by solicitation number FA462623R0011 and is classified under NAICS code 238910 for Site Preparation Contractors and PSC code Z2PZ for Repair or Alteration of Other Non-Building Facilities. This procurement is designated as a Small Business Administration (SBA) set-aside. Interested parties must submit their responses by the deadline of August 15, 2023.
The primary point of contact for this solicitation is Mark Jefferson. Associated documentation includes a single attachment, a site visit sign-in sheet, which was added during the most recent update on July 31, 2023. The performance will take place across multiple Launch Facility locations managed by the agency.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Mark Jefferson
Not specified
This work will be performed at various Launch Facilities (LFs). Work will consist of restoring site elevations around support buildings and driving surfaces, cleaning of existingculverts, installing new culverts, importing and placing aggregate base course, ditch and driving surface reshaping to ensure proper drainage of surface water from site.