Office Repairs for Hastings, MN
Contact and place of performance
Justin Rose
55033
The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a �? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier,...
View moreThe Department of the Army, U.S. Army Corps of Engineers St. Paul District, issued this award notice for office repairs at the Hastings Resident Office located at Lock and Dam 2 in Hastings, MN. The project addresses flood damage resulting from a frozen and burst copper water pipe. Under solicitation number W912ES26QA030, the contractor is required to remove and replace damaged materials including wall base molding, drywall, wall and ceiling insulation, water vapor barriers, bathroom wall tiles, stained carpet, ceiling tiles, and LED light panels. Replacement materials must match existing undamaged components or receive approval from the Contracting Officer.
The scope of work encompasses repairing the burst water pipe, reconnecting kitchenette plumbing fixtures and the hot water heater, and painting new sheetrock and affected areas near floor molding and electrical conduit. Additional requirements include remounting electrical conduit, fire alarm annunciators, and fire extinguishers, as well as testing the fire alarm system functionality. The contractor will also steam clean carpets, apply an epoxy floor with non-slip grip in the server room, and conduct air sampling for mold testing both before and after the repair process.
This procurement was designated as a Small Business Administration (SBA) set-aside. The primary classification for this requirement is NAICS 238310, Drywall and Insulation Contractors, and PSC Z2AA, Repair or Alteration of Office Buildings. Managed by Justin Rose, the notice was published on March 31, 2026, and includes one PDF attachment.