Name | Type | Posted | Actions |
|---|---|---|---|
RFIs.pdf | Apr 14, 2026 | ||
Site Visit Sign-In 04012026.pdf | Apr 14, 2026 | ||
Site Visit Sign-In 03312026.pdf | Apr 14, 2026 | ||
SF30 - Amendment 01.pdf | Apr 14, 2026 | ||
Attachment 6 - Project Specific Submittal Log.xlsx | XLSX | Mar 20, 2026 | |
Attachment 5 - Div 1 Submittal Log.xlsx | XLSX | Mar 20, 2026 | |
Attachment 4 - Div 1 General Requirements.pdf | Mar 20, 2026 | ||
Attachment 10 - Wage Determination.pdf | Mar 20, 2026 | ||
Attachment 2 - MSB Second Floor Box Demo Dwg.pdf | Mar 20, 2026 | ||
Attachment 1 - Statement of Work.pdf | Mar 20, 2026 | ||
SF1442 - Solicitation Terms and Conditions.pdf | Mar 20, 2026 | ||
Attachment 3 - MSB Drn Instl 2nd Flr.pdf | Mar 20, 2026 | ||
Attachment 9 - MSB Structural Drawing.pdf | Mar 20, 2026 | ||
Attachment 8 - MSB Structural Drawing.pdf | Mar 20, 2026 | ||
Attachment 7 - MSB Structural Drawing.pdf | Mar 20, 2026 |
Drain Modifications
Contact and place of performance
Joshua J. Dobereiner
PA 19038
USA
AMENDMENT 01 - 04/14/2026 Solicitation is amended to post the site visit sign-in sheets and responses to all requests for information (RFIs) received by the RFI deadline. All other terms and conditions remain unchanged. Acknowledgement of amendment is required with quote submission by either returning a signed copy of the SF-30 or completing section 19 on the SF-1442. END OF AMENDMENT 01 _______________________...
View moreOrganized site visits have been scheduled for March 31, 2026 at 1:00 PM Eastern Daylight Time (EDT) and April 1, 2026 at 9:00 AM EDT. The same information will be provided at both site visits, so offerors only need to attend one. Contractors wishing to attend the site visit must RSVP by emailing [email protected] by March 30, 2026 at 4:00 PM EDT with the names of attendees, company they are with, and company(s) they are representing. A Government issued photo ID is required for attendance.
The site visit will be held for the purpose of providing contractors with the opportunity to familiarize themselves with the site, which may be helpful in the preparation of quotes. Attendance at the site visit is not mandatory for quote submission; however, failure to visit the site will not relieve or mitigate the successful contractor’s responsibility and obligation to fully comply with the terms, conditions, and specifications contained and/or referenced in this document.
All questions regarding this solicitation must be submitted in writing to the Contracting Officer, Josh Dobereiner, via email to [email protected]. Questions must be submitted no later than 4:00 PM EDT on April 13, 2026. Answers to all questions received by that time will be posted as an amendment to the solicitation. No questions will be answered after this date unless determined to be in the best interest of the Government as deemed by the Contracting Officer. Telephone requests for information will not be accepted or returned.
See “SF1442 – Solicitation Terms and Conditions” for applicable clauses, instructions, and evaluation criteria.
See “Attachment 1 – Statement of Work” for complete details on the work required.
Technical data and supporting documentation associated with this solicitation are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the posting:
The U.S. Department of Agriculture’s Agricultural Research Service has issued a combined synopsis/solicitation, 1232SA26Q0340, for drain modifications and equipment removal. This project involves work within the mechanical services building at the Eastern Regional Research Center located in Pennsylvania. This acquisition is a total small business set-aside under the Small Business Administration (SBA) program. It is classified under NAICS 238220 for Plumbing, Heating, and Air-Conditioning Contractors and PSC Z2EB for repair or alteration of maintenance buildings.
The scope of work includes the removal of equipment and the installation of modified drainage systems as detailed in the technical specifications and structural drawings. Amendment 01, published on April 14, 2026, incorporated site visit sign-in sheets and responses to requests for information into the solicitation requirements. Performance is supported by 15 attachments, including a statement of work, general requirements, submittal logs, and applicable wage determinations.
Joshua J. Dobereiner is the primary point of contact for this requirement. All responsible sources must submit their quotations by the response deadline of April 24, 2026. Submissions must include an acknowledgment of all amendments, either through a signed SF-30 or by completing the relevant section of the SF-1442. Evaluation criteria and specific instructions for this commercial items procurement are governed by FAR Part 12.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.