Name | Type | Posted | Actions |
|---|---|---|---|
W912PL25B0004_Abstract_Redondo_Breakwater_Repair_08Aug2025_-signed.pdf | Aug 11, 2025 | ||
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912PL25B0004¬iceType=SolicitationNotice | LINK | Jun 30, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 30, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jun 30, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 30, 2025 |
NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
Contact and place of performance
Cameron Stokes
90277
Update 0007 to transmit SF30 of Amendment 0004 for IFB W912PL25B0004, amendment does not extend the bid opening date of 8/8/2025. Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for i...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Los Angeles District, is soliciting bids for the repair of a shore-connected, rubble-mound breakwater at King Harbor in Redondo Beach, California. The project scope involves restoring the structure to its design elevations and slopes by resetting existing armor stone and placing approximately 8,000 tons of new 14-ton median-sized armor stone. Work also includes repairs to an 8-foot-wide harborside armor stone bench located at an elevation of +10.0 feet Mean Lower Low Water (MLLW). The estimated magnitude of the project is between $5,000,000 and $10,000,000, with an anticipated performance period of 210 calendar days.
This requirement is identified under solicitation number W912PL25B0004 and is classified under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC Z2KZ for Repair or Alteration of Other Conservation and Development Facilities. The acquisition is being conducted as an Unrestricted Sealed Bid under FAR Part 14 procedures. Large business offerors are required to submit a subcontracting plan for any award exceeding $1,500,000. Bids are due by August 8, 2025, and a bid abstract was published on August 11, 2025, as part of the official record.
Recent administrative updates and amendments have revised the project’s table of contents, the CLIN schedule, and price and payment procedures. Technical updates include revisions to Section 35 31 23 regarding breakwaters, temporary environmental controls, and the replacement of several plan sheets. Survey data and updated bid guarantee details have also been provided to prospective bidders. Cameron Stokes serves as the primary point of contact for this solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.