Name | Type | Posted | Actions |
|---|---|---|---|
W912PL25B0004_Abstract_Redondo_Breakwater_Repair_08Aug2025_-signed.pdf | Aug 11, 2025 | ||
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912PL25B0004¬iceType=SolicitationNotice | LINK | Jun 30, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 30, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jun 30, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 30, 2025 |
NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
Contact and place of performance
Cameron Stokes
90277
Update 0007 to transmit SF30 of Amendment 0004 for IFB W912PL25B0004, amendment does not extend the bid opening date of 8/8/2025. Update 0006 is to transmit the SF30 of Amendment 0003 for the IFB W912PL25B0004, this amendment does not extend the bid opening date. This is to revise Table of Contents, revise Section 35 31 23 Breakwaters, and replace plan sheets CN101, CN102, CN302, CN303 and CN304. Update 0005 is for i...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Los Angeles District, is soliciting unrestricted sealed bids for repairs to the north breakwater at Redondo Beach-King Harbor in Los Angeles County, California. This project involves restoring a shore-connected, rubble-mound breakwater to its original design elevations and slopes in identified damage areas. Work requirements include resetting existing armor stone and the furnishing and placement of approximately 8,000 tons of new armor stone with a median size of 14 tons. Additionally, the project includes repairs to an armor stone bench on the harborside of the structure, situated at an elevation of +10.0 feet MLLW with a width of 8.0 feet.
The procurement is identified by solicitation number W912PL25B0004 and is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z2KZ, Repair or Alteration of Other Conservation and Development Facilities. The estimated value of the project is between $5,000,000 and $10,000,000, with a total performance period of approximately 210 calendar days. Large business offerors are required to submit a subcontracting plan for any award exceeding $1,500,000.
Recent amendments to the invitation for bids have updated the bid guarantee details, survey data, and technical specifications for breakwaters and plan sheets. The response deadline for this solicitation is August 8, 2025. Following the bid opening, the government published a signed abstract of bids on August 11, 2025, as part of the official record. Cameron Stokes serves as the primary point of contact for this requirement.