Name | Type | Posted | Actions |
|---|---|---|---|
36C25026Q0034 0005.pdf | May 28, 2026 | ||
36C25026Q0034 0004.pdf | Dec 11, 2025 | ||
539-25-505 - CD Set - Revision 1.pdf | Dec 11, 2025 | ||
REVISED STATEMENT OF BID ITEMS.pdf | Dec 11, 2025 | ||
36C25026Q0034 0003.pdf | Dec 10, 2025 | ||
36C25026Q0034 0002.pdf | Nov 25, 2025 | ||
36C25026Q0034 0001.pdf | Nov 4, 2025 | ||
Attachment V - vha directive 1192.01.pdf | Oct 31, 2025 | ||
Attachment VI - Specs.pdf | Oct 31, 2025 | ||
Attachment III - RFI.pdf | Oct 31, 2025 | ||
Attachment II - EMR.pdf | Oct 31, 2025 | ||
Attachment IV - Limitation on Subcontracting Cert.pdf | Oct 31, 2025 | ||
36C25026Q0034_1.pdf | Oct 31, 2025 | ||
Attachment I - DBA.pdf | Oct 31, 2025 | ||
Attachment VII - Construction Documents.pdf | Oct 31, 2025 |
539-25-505 Maintain Parking Garage Safety
Contact and place of performance
Samuel Galbreath
Cincinnati, OH 45220
USA
The “Maintain Parking Garage Safety” project will replace waterproofing joint sealants throughout the garage, as well as remove and patch concrete at the joints between slabs where water intrusion has caused damage. This work is to be performed over weekends to avoid conflicts with VA operations. The contractor will also procure and coordinate with a firm, THP LTD, qualified to perform consulting service...
View moreThe Department of Veterans Affairs is soliciting bids for project 539-25-505 to maintain parking garage safety at its facility in Cincinnati, Ohio. This solicitation, identified by number 36C25026Q0034, is categorized under NAICS 238110 Poured Concrete Foundation and Structure Contractors and PSC Z1DZ MAINTENANCE OF OTHER HOSPITAL BUILDINGS. The procurement is designated as a total set-aside for SDVOSBC SDVOSBC. Responses are due by May 28, 2026, to the point of contact, Samuel Galbreath.
The scope of work involves replacing waterproofing joint sealants throughout the parking structure and patching concrete at slab joints where water intrusion has caused damage. The contractor is required to coordinate with the firm THP LTD to perform structural condition consulting, which includes reviewing floors, soffits, perimeter walls, facades, and stair towers for deterioration. This assessment also requires sounding surveys and chloride ion testing of each floor following general industry standards for parking structure condition assessments.
Performance is scheduled for weekends to ensure work does not conflict with daily agency operations. The solicitation includes 15 attachments, such as revised statements of bid items, construction document sets, and several amendments. The contractor is responsible for providing all necessary structural and waterproofing remedies as identified during the assessment phase.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.