Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 00003 - RFI Responses.pdf | May 7, 2026 | ||
26 0427 CD Dwgs_100 percent_incl ASI 1.pdf | May 7, 2026 | ||
26 0427 CD Specs_100 percent_incl ASI 1.pdf | May 7, 2026 | ||
Inclusions in the Scope of Work.pdf | May 7, 2026 | ||
Amendment 00002 - Extend Proposal Due Date.pdf | Apr 27, 2026 | ||
CDC VISITOR REQUEST FORM - Fort Collins Campus - Form 0.1586 (E) Ver20240515.pdf | Apr 8, 2026 | ||
Amendment 00001 - Site Visit Date Added.pdf | Apr 8, 2026 | ||
A19.1 - Solicitation Cover Letter.pdf | Mar 25, 2026 | ||
A21d. Employee Non-Disclosure Agreement.docx | DOCX | Mar 25, 2026 | |
A19. Solicitation - 75D301-26-R-73423.pdf | Mar 25, 2026 | ||
Latest Statement of Work.pdf | Mar 25, 2026 | ||
100 Percent CD Drawings.pdf | Mar 25, 2026 | ||
100 Percent CD Specifications.pdf | Mar 25, 2026 | ||
Updated Wage Determination.txt | TXT | Mar 25, 2026 | |
A21d. Contractor's Non-Disclosure Agreement.docx | DOCX | Mar 25, 2026 |
Level 2 FRP Over Lab Ceilings Installation- COFC0401
Level 2 FRP Over Lab Ceilings Installation- COFC0401
Contact and place of performance
Brad Edwards
Fort Collins, CO 80521
USA
Amendment 0003 (See Attached) Issues responses to RFIs Extends the date for the submission of Proposals to Monday, 18 May 2026 Incorporates additional technical documents into the solicitation Amendment 0002 (See Attached): Extends the date for the submission of proposals to Monday, 11 May 2026. Amendment 0001 (See Attached): A site visit is scheduled for April 13, 2026, at 0930 (MT). See attached amendment for instr...
View moreThe project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government.
Period of Performance:
Completion is required within 180 days after Notice to Proceed.
Minimum Vendor Qualifications:
Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.
The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridor, and ancillary spaces on the second floor of Building 401 at the Fort Collins, CO campus. This project involves covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim to match existing building installations. The selected contractor will provide all materials, equipment, labor, and supervision for demolition of delaminated ceiling portions, surface preparation, installation, sealing, and coordination for phased access to work areas.
Work must be performed in accordance with the provided contract documents and specifications, which include requirements for temporary barriers, dust control, and the protection or temporary modification of fire protection systems to minimize disruption to CDC operations. Offerors must demonstrate at least three years of experience with similar construction and interior finish projects. The period of performance requires completion within 180 days after the issuance of the Notice to Proceed.
This combined synopsis/solicitation is identified by solicitation number 75D301-26-R-73423 and is designated as a HUBZone (HZC) set-aside. The acquisition is classified under NAICS 236220 Commercial and Institutional Building Construction and PSC Z1DB Maintenance of Laboratories and Clinics. Proposals are due by May 18, 2026, and Brad Edwards is the primary point of contact. Supporting documentation includes 15 attachments, such as technical drawings, specifications, RFI responses, and visitor request forms for site access.