Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 00003 - RFI Responses.pdf | May 7, 2026 | ||
26 0427 CD Dwgs_100 percent_incl ASI 1.pdf | May 7, 2026 | ||
26 0427 CD Specs_100 percent_incl ASI 1.pdf | May 7, 2026 | ||
Inclusions in the Scope of Work.pdf | May 7, 2026 | ||
Amendment 00002 - Extend Proposal Due Date.pdf | Apr 27, 2026 | ||
CDC VISITOR REQUEST FORM - Fort Collins Campus - Form 0.1586 (E) Ver20240515.pdf | Apr 8, 2026 | ||
Amendment 00001 - Site Visit Date Added.pdf | Apr 8, 2026 | ||
A19.1 - Solicitation Cover Letter.pdf | Mar 25, 2026 | ||
A21d. Employee Non-Disclosure Agreement.docx | DOCX | Mar 25, 2026 | |
A19. Solicitation - 75D301-26-R-73423.pdf | Mar 25, 2026 | ||
Latest Statement of Work.pdf | Mar 25, 2026 | ||
100 Percent CD Drawings.pdf | Mar 25, 2026 | ||
100 Percent CD Specifications.pdf | Mar 25, 2026 | ||
Updated Wage Determination.txt | TXT | Mar 25, 2026 | |
A21d. Contractor's Non-Disclosure Agreement.docx | DOCX | Mar 25, 2026 |
Level 2 FRP Over Lab Ceilings Installation- COFC0401
Contact and place of performance
Brad Edwards
Fort Collins, CO 80521
USA
Amendment 0003 (See Attached) Issues responses to RFIs Extends the date for the submission of Proposals to Monday, 18 May 2026 Incorporates additional technical documents into the solicitation Amendment 0002 (See Attached): Extends the date for the submission of proposals to Monday, 11 May 2026. Amendment 0001 (See Attached): A site visit is scheduled for April 13, 2026, at 0930 (MT). See attached amendment for instr...
View moreThe project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government.
Period of Performance:
Completion is required within 180 days after Notice to Proceed.
Minimum Vendor Qualifications:
Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.
The Centers for Disease Control and Prevention (CDC) is soliciting proposals for a construction project to repair and refinish interior surfaces at Building 401 on the Fort Collins, Colorado campus. The primary scope involves repairing gypsum board ceilings and walls within second-floor laboratories, support spaces, corridors, and ancillary areas. Work includes the demolition of delaminated ceiling sections, surface preparation, and the installation of smooth, white fiberglass reinforced polymer (FRP) panels and trim designed to match existing building standards. The contractor is responsible for providing all labor, materials, equipment, and supervision, including the implementation of temporary barriers, dust control, and modifications to fire protection systems to ensure compliance with health and safety regulations.
This solicitation, identified by number 75D301-26-R-73423, is designated as a HUBZone (HZC) set-aside. It falls under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Z1DB for Maintenance of Laboratories and Clinics. Proposals are due by May 18, 2026, and the project must be completed within 180 days following the issuance of the Notice to Proceed. Offerors must demonstrate at least three years of experience with similar construction and interior finish projects to meet minimum vendor qualifications.
The procurement record includes 15 attachments, such as technical drawings, specifications, RFI responses, and visitor request forms for site access. Administrative updates to the solicitation have included the scheduling of a site visit on April 13, 2026, and subsequent extensions to the proposal submission deadline. The project requires phased coordination with the CDC to minimize disruptions to ongoing operations at the facility. Brad Edwards serves as the primary point of contact for this requirement.