Name | Type | Posted | Actions |
|---|---|---|---|
IFB - 12FPC326B0012 Combined Synopsis.pdf | May 20, 2026 | ||
Attachment 1 Specifications.pdf | May 19, 2026 | ||
Attachment 2 Tyler Dam Drawings.pdf | May 19, 2026 | ||
Attachment 3 - WD MA20250006 1-30-2026.pdf | May 19, 2026 | ||
Attachment 4 - WD MA20250008 1-2-2026.pdf | May 19, 2026 | ||
IFB - 12FPC326B0012 Combined Synopsis.pdf | May 19, 2026 |
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Contact and place of performance
Mark Domingo
MA 01752
USA
Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27ᵗʰ at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary ...
View moreThe Farm Production and Conservation Business Center has issued a combined synopsis/solicitation, 12FPC326B0012, for the Tyler Dam Rehabilitation project in Worcester County, Massachusetts. The scope of work involves rehabilitating an existing floodwater retarding dam to comply with current safety and performance standards following engineering studies that identified inadequate auxiliary spillway capacity. Key tasks include excavating the approach channel to improve flow efficiency, installing a geosynthetic clay liner, raising portions of the dam embankment crest, and constructing a concrete crest wall to prevent overtopping at the Robin Hill Street intersection. Additional requirements involve replacing concrete joint sealant in spillway structures, replacing chain-link fencing, and removing trees within 20 feet of the upstream embankment groin.
This requirement is classified under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC Y1QA for Construction of Restoration of Real Property (Public or Private). The solicitation is designated as a Small Business Administration (SBA) set-aside. Project documentation includes six attachments such as specifications, dam drawings, and wage determinations. A site showing is scheduled for May 27, 2026, at the performance location in Marlborough, Massachusetts. Mark Domingo is the designated point of contact, and all responses are due by June 18, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.