Name | Type | Posted | Actions |
|---|---|---|---|
SOW Q-NEXT Inductively Coupled Etching System.pdf | May 15, 2026 | ||
ANL-366M (on-site mod risk)-01-OCT-2024.PDF | May 15, 2026 | ||
Appendix A-71COM-22-OCT-2025.PDF | May 15, 2026 | ||
ANL-407 Quality Assurance Procurement Requirements.docx | DOCX | May 15, 2026 | |
ANL-70B Reps Certs Long - 20250113 (002) (1).pdf | May 15, 2026 | ||
ANL-70 Request for Quotation.doc | DOC | May 15, 2026 |
Inductively Coupled Etching System
Contact and place of performance
Molly Hunter
IL 60439
USA
Argonne National Laboratory is seeking quotations for an Inductively Coupled Etching System in accordance with the Statement of Work titled “Q-NEXT Inductively Coupled Etching System,” dated April 27, 2026 . Award will be made on a Lowest Price, Technically Acceptable (LPTA) basis. Vendors must provide sufficient documentation to demonstrate that their proposed system m...
View moreArgonne National Laboratory, a Department of Energy contractor, is seeking quotations for an Inductively Coupled Etching System to be delivered to Illinois under solicitation number 6-S176-Q-00231-00. This procurement is classified under NAICS 333242 Semiconductor Machinery Manufacturing and PSC 6640 Laboratory Equipment and Supplies. The acquisition supports the Q-NEXT project, and the equipment must adhere to the technical specifications defined in the Statement of Work dated April 27, 2026.
The laboratory will make an award on a Lowest Price, Technically Acceptable (LPTA) basis. To be considered, vendors must submit a completed ANL-70 Request for Quotation with pricing and a completed ANL-70B Representations and Certifications form. Documentation provided by the vendor must sufficiently demonstrate that the proposed system meets all technical requirements established in the solicitation.
The notice includes six attachments, including quality assurance procurement requirements, on-site modification risk assessments, and the Statement of Work, all published on May 15, 2026. Molly Hunter is the designated point of contact for this requirement. All responses are due by 5:00 p.m. CDT on May 26, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.