Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 31, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 31, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 31, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911KB25R0003 | LINK | Mar 31, 2025 |
JBE081 F-22 Fuel Systems
JBE081 F-22 Fuel Systems
Contact and place of performance
Katherine Green
99506
This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fu...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Alaska District, is soliciting proposals for a design-bid-build project to construct Petroleum, Oil, and Lubricant (POL) infrastructure at Joint Base Elmendorf-Richardson (JBER), Alaska. Identified by solicitation number W911KB25R0003, the project supports F-22 fighter aircraft operations by increasing fuel storage capacity from 150,000 gallons to 420,000 gallons. The scope includes constructing a new JP-8 Tank Farm #6 featuring a jet-fuel pumphouse with two 5,000-barrel aboveground storage tanks, a diesel standby generator, and an 1,800-gpm underground receipt pipeline. Additional components include a two-position truck offload stand, a four-position fuel truck fill stand, a hydrant hose truck checkout station, and an underground stainless steel hydrant loop. The contract also requires the demolition of the existing Tank Farm #5 facility, including its underground storage tanks and associated structures.
This procurement is classified under NAICS 237120 for Oil and Gas Pipeline and Related Structures Construction and PSC Y1NA for Construction of Fuel Supply Facilities. Controlled Unclassified Information (CUI) regarding Brand Name Justification and Approval (JA) for the project generators must be requested via email from the identified points of contact, Katherine Green or Theresa M. Afrank, and must include a CAGE code. Recent modifications to the solicitation via amendment 0008 have removed Project Labor Agreement requirements and extended the proposal deadline. Submissions are due by August 25, 2025.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.