Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 31, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 31, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 31, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911KB25R0003 | LINK | Mar 31, 2025 |
JBE081 F-22 Fuel Systems
JBE081 F-22 Fuel Systems
Contact and place of performance
Katherine Green
99506
This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fu...
View moreThe U.S. Army Corps of Engineers, Alaska District, is soliciting proposals for solicitation W911KB25R0003, a Design-Bid-Build project to construct Petroleum, Oil, and Lubricant infrastructure at Joint Base Elmendorf-Richardson, Alaska. The project supports 5th generation F-22 fighter aircraft by increasing fuel storage capacity from 150,000 to 420,000 gallons. Major components include the construction of the new JP-8 Tank Farm #6 featuring a jet-fuel pumphouse, two 5,000-barrel aboveground storage tanks, a diesel standby generator, and an 1,800-gpm underground receipt pipeline. The work also involves a two-position truck offload stand, a four-position fuel truck fill stand, a hydrant hose truck checkout station, and an underground stainless steel hydrant loop.
Additional requirements encompass the demolition of the existing Tank Farm #5 facility, including its underground storage tanks, canopies, and fuel truck fill stands. This procurement is classified under NAICS 237120 for Oil and Gas Pipeline and Related Structures Construction and PSC Y1NA for Construction of Fuel Supply Facilities. Project Labor Agreement requirements were removed via amendment 0008, and Controlled Unclassified Information regarding brand name justifications for generators must be requested via email from the points of contact. Proposals are due by August 25, 2025.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.