Name | Type | Posted | Actions |
|---|---|---|---|
W9127N26BA001 JD Fish Pump Abstract of Offers - Signed.pdf | May 21, 2026 | ||
BURIAL VAULTS HAND DRAWING.pdf | May 12, 2026 | ||
FCQ4.jpg | JPG | May 12, 2026 | |
W9127N26BA001 Amendment 0004 SF 30.pdf | May 12, 2026 | ||
Fish Pump Room Oneline.jpg | JPG | May 12, 2026 | |
W9127N26BA001 CONTRACTOR JD FISH PUMP SITE VISIT ROSTER 27APR26_Redacted.pdf | May 4, 2026 | ||
JDD So Fish U-3_O and M Manual.pdf | May 1, 2026 | ||
JD-63-391-50.pdf | May 1, 2026 | ||
Propeller_Condition.zip | ZIP | May 1, 2026 | |
Pump_Access.zip | ZIP | May 1, 2026 | |
W9127N26BA001 Amendment 0003 SF 30.pdf | May 1, 2026 | ||
Water Piping and Secondary Access Point FIO drawings.zip | ZIP | May 1, 2026 | |
AMD0002_Technical Sections.pdf | Apr 22, 2026 | ||
ODJ Fish Pumps Rehabilitation FOR REFERENCE ONLY DRAWINGS_BCOES_SAM_rev002.pdf | Apr 22, 2026 | ||
Specifications - John Day Fish Pumps Appendix A - Work Space Access Trailer and Parking Locations.pdf | Apr 22, 2026 | ||
W9127N26BA001 Amendment 0002 SF 30.pdf | Apr 22, 2026 | ||
W9127N26BA001 Amendment 0001 SF 30.pdf | Apr 9, 2026 | ||
ODJ Fish Pumps Rehabilitation FOR REFERENCE ONLY DRAWINGS.pdf | Apr 9, 2026 | ||
W9127N26BA001 Solicitation JDFPER25.pdf | Apr 8, 2026 |
John Day Fish Pump Rehabilitation
John Day Fish Pump Rehabilitation
Contact and place of performance
Kristel Flores
Rufus, OR
USA
W9127N26BA001 Abstract of Offers posted 21 May 2026 W9127N26BA001 Amendment 0004 posted 12 May 2026 Update : Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation. W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026 W9127N26BA001 Amendment 0003 posted 1 May 202...
View morePurpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.
The following information represents the project objectives:
The U.S. Army Corps of Engineers Portland District is soliciting a firm-fixed-price contract for the rehabilitation of Fish Pump Units 1, 2, and 3 at the John Day Dam in Rufus, Oregon. This project, identified under solicitation number W9127N26BA001, is a total Small Business Set-Aside (SBA). The scope of work involves the removal, refurbishment, and replacement of major mechanical components, including shafts, bearings, bearing brackets, and approximately 1,000-horsepower class power transmission and reduction gearboxes. This requirement falls under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC Z2KA for Repair or Alteration of Dams.
The rehabilitation process requires field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, and fabrication of replacement parts. Specific technical objectives include the installation of greaseless bearing liners, replacement of stainless-steel bearing journals, and true-up machining of diffuser components. Following off-site repairs, the contractor will perform on-site reassembly, shaft alignment, system balancing, and functional performance testing. Deliverables include updated operation and maintenance manuals, drawings, and spare parts.
The response deadline for this solicitation is May 20, 2026. Kristel Flores serves as the point of contact for this procurement. The solicitation includes 19 attachments, such as the abstract of offers, site visit rosters, technical drawings of the fish pump room, and four formal amendments. Bidder inquiries through ProjNet were scheduled to close on May 6, 2026, to allow for responses prior to the bid submission deadline.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.