Name | Type | Posted | Actions |
|---|---|---|---|
W9127N26BA001 JD Fish Pump Abstract of Offers - Signed.pdf | May 21, 2026 | ||
BURIAL VAULTS HAND DRAWING.pdf | May 12, 2026 | ||
FCQ4.jpg | JPG | May 12, 2026 | |
W9127N26BA001 Amendment 0004 SF 30.pdf | May 12, 2026 | ||
Fish Pump Room Oneline.jpg | JPG | May 12, 2026 | |
W9127N26BA001 CONTRACTOR JD FISH PUMP SITE VISIT ROSTER 27APR26_Redacted.pdf | May 4, 2026 | ||
JDD So Fish U-3_O and M Manual.pdf | May 1, 2026 | ||
JD-63-391-50.pdf | May 1, 2026 | ||
Propeller_Condition.zip | ZIP | May 1, 2026 | |
Pump_Access.zip | ZIP | May 1, 2026 | |
W9127N26BA001 Amendment 0003 SF 30.pdf | May 1, 2026 | ||
Water Piping and Secondary Access Point FIO drawings.zip | ZIP | May 1, 2026 | |
AMD0002_Technical Sections.pdf | Apr 22, 2026 | ||
ODJ Fish Pumps Rehabilitation FOR REFERENCE ONLY DRAWINGS_BCOES_SAM_rev002.pdf | Apr 22, 2026 | ||
Specifications - John Day Fish Pumps Appendix A - Work Space Access Trailer and Parking Locations.pdf | Apr 22, 2026 | ||
W9127N26BA001 Amendment 0002 SF 30.pdf | Apr 22, 2026 | ||
W9127N26BA001 Amendment 0001 SF 30.pdf | Apr 9, 2026 | ||
ODJ Fish Pumps Rehabilitation FOR REFERENCE ONLY DRAWINGS.pdf | Apr 9, 2026 | ||
W9127N26BA001 Solicitation JDFPER25.pdf | Apr 8, 2026 |
John Day Fish Pump Rehabilitation
Contact and place of performance
Kristel Flores
Rufus, OR
USA
W9127N26BA001 Abstract of Offers posted 21 May 2026 W9127N26BA001 Amendment 0004 posted 12 May 2026 Update : Bidder Inquiries in ProjNet will close at the end of the day (6 MAY 2026) and all responses will be posted on or before the 7th business day preceding the bid submission IAW the solicitation. W9127N26BA001 Contractor JD Fish Pump Site Visit Roster posted 4 May 2026 W9127N26BA001 Amendment 0003 posted 1 May 202...
View morePurpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.
The following information represents the project objectives:
The U.S. Army Corps of Engineers Portland District is soliciting a firm-fixed-price contract for the rehabilitation of Fish Pump Units 1, 2, and 3 at the John Day Dam in Rufus, Oregon. This project, identified under solicitation number W9127N26BA001, is categorized under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC Z2KA for Repair or Alteration of Dams. The procurement is designated as an SBA Small Business Set-Aside.
The scope of work involves the removal, refurbishment, and replacement of major mechanical components, including shafts, bearings, bearing brackets, and 1,000-horsepower class right-angle drive gearboxes. Specific objectives include the installation of greaseless bearing liners, precision machining of diffuser components and bearing housings, and the fabrication of replacement parts. Following field disassembly and off-site shop repairs, the contractor will perform on-site reassembly, shaft alignment, and system balancing. The project concludes with functional performance testing and the delivery of updated operation and maintenance manuals and drawings.
Administrative milestones for this solicitation include a response deadline of May 20, 2026. The agency published 19 total attachments to support the requirement, including site visit rosters, technical drawings, and an abstract of offers. Kristel Flores serves as the primary point of contact for this requirement.