Installation of Washer and Dryer in Greenhouse
Installation of Washer and Dryer in Greenhouse
Contact and place of performance
Jim Roloff
Gastonia, NC 28054
USA
The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung front‑load washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project. The installation area is located along an exterior wall in the greenhouse entryway. Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.
Two sets of photos are posted below.
RFIs posted below.
Site visit attendance sheet posted below.
The USDA Animal and Plant Health Inspection Service (APHIS) MRPBS has issued this combined synopsis/solicitation for the installation of a stacked washer and dryer at an AMS Science & Technology Program greenhouse facility in Gastonia, North Carolina. This requirement supports laboratory and operational needs using a government-owned Samsung front-load washer and dryer set. The scope of work involves supplying and installing a compatible stacking kit, reconfiguring existing plumbing, and performing new electrical, ventilation, and structural modifications along an exterior wall in the greenhouse entryway.
The project is classified under NAICS 238220 for Plumbing, Heating, and Air-Conditioning Contractors and PSC Y1JZ for Construction of Miscellaneous Buildings. This procurement is a Small Business Administration (SBA) set-aside. Administrative and technical details are provided across seven attachments, including a statement of work, federal construction wage rates for Gaston County, site visit documentation, and request for information (RFI) responses.
Submissions are due by June 10, 2026, and the primary point of contact is Jim Roloff. This solicitation, identified by number 12639526Q0143, was published on May 9, 2026, and updated on June 3, 2026. All work will be performed at the specified facility in Gastonia, North Carolina.