Name | Type | Posted | Actions |
|---|---|---|---|
Site visit attendance.pdf | Jun 3, 2026 | ||
RFIs and responses.docx | DOCX | May 29, 2026 | |
Photos 1.pdf | May 27, 2026 | ||
Photos 2.pdf | May 27, 2026 | ||
Attachment 1_Statement of Work.docx | DOCX | May 9, 2026 | |
Attachment 2_Federal Construction Wage Rates_Gaston County.txt | TXT | May 9, 2026 | |
12639526Q0143.docx | DOCX | May 9, 2026 |
Installation of Washer and Dryer in Greenhouse
Installation of Washer and Dryer in Greenhouse
Contact and place of performance
Jim Roloff
Gastonia, NC 28054
USA
The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung front‑load washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project. The installation area is located along an exterior wall in the greenhouse entryway. Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.
Two sets of photos are posted below.
RFIs posted below.
Site visit attendance sheet posted below.
The United States Department of Agriculture Animal and Plant Health Inspection Service (APHIS) MRPBS requires the installation of a stacked washer and dryer at an Agricultural Marketing Service (AMS) greenhouse facility in Gastonia, North Carolina. The project involves utilizing a government-owned Samsung front-load washer and dryer set. The contractor must provide and install a compatible stacking kit and perform the necessary facility modifications for the installation area located in the greenhouse entryway.
Construction efforts include reconfiguring existing plumbing along an exterior wall and implementing new electrical, ventilation, and structural modifications to support the equipment. This requirement is categorized under NAICS 238220 for Plumbing, Heating, and Air-Conditioning Contractors and PSC Y1JZ for Construction of Miscellaneous Buildings. The solicitation is designated as a Small Business Administration (SBA) SBA set-aside.
Solicitation number 12639526Q0143 was published on May 9, 2026, and updated on June 3, 2026, with a response deadline of June 10, 2026. Administrative records for this notice include seven attachments, such as a Statement of Work, Federal Construction Wage Rates for Gaston County, requests for information (RFIs) and responses, site visit attendance records, and various photographs. Jim Roloff serves as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.